Toronto Daniels Waterfront - City of the Arts | 156.05m | 45s | Daniels | RAW Design

6C5B80BA-45A2-420C-ADD0-922C3AA32CBE.jpeg

7D6D0622-C39A-412C-A25F-03DBC68A044C.jpeg

45EF5FE9-B80E-42FE-B349-5C278E796D84.jpeg

9C83CF34-AC53-4D05-A28F-0CC836727CF4.jpeg

73B2BD60-5E51-4314-A8BF-E5BDBFF1B7E1.jpeg

BA70D372-0236-4E34-9057-F2336FCF038A.jpeg
 

Attachments

  • F1285A77-64A4-4D9D-8F05-1A980C5A787E.jpeg
    F1285A77-64A4-4D9D-8F05-1A980C5A787E.jpeg
    298.6 KB · Views: 319
  • 042A5DBE-02B1-46BB-B70D-8150C3A24D78.jpeg
    042A5DBE-02B1-46BB-B70D-8150C3A24D78.jpeg
    214 KB · Views: 344
  • 64435C61-BB44-409C-ACAA-A5BFFE8D87E8.jpeg
    64435C61-BB44-409C-ACAA-A5BFFE8D87E8.jpeg
    305.1 KB · Views: 304
  • 22F1B0AD-F241-4E19-8E96-38915A90B43A.jpeg
    22F1B0AD-F241-4E19-8E96-38915A90B43A.jpeg
    186.3 KB · Views: 315
Last edited by a moderator:
So what are they planning to lift today? Cooling tower? chiller? Mech room at 120m + clearances. Probably 30m reach. Where is @Razz

I guess the previous tower crane couldn’t lift the load. Weight, delivery, logistics?
The west tower cooling tower was already installed.

22EF3D10-C5C6-446E-A08E-862E5401C6E0.jpeg
9304661A-8A3B-466B-AF97-97854D547311.jpeg
F66CF25F-11B5-4CA4-BA03-22285B488BCE.jpeg
 

Back
Top