Actually they are making massive progress at eglinton. Almost done the station box, and are finishing with track installation. They actually might get it done next year.
As predicted since they can divert more resources from the completed stations to those that are still UC. Hopefully they can maintain the sched.
 

toronto647

Active Member
Member Bio
Joined
Mar 7, 2020
Messages
516
Reaction score
983
As predicted since they can divert more resources from the completed stations to those that are still UC. Hopefully they can maintain the sched.
They indicated they will get 100% of track railing and the overhead power installed by end of year. And then they would have another year for testing while concurrently finishing up construction where required and not interferring with the whole line testing. If they can get this up and running by mid September I think thats a major win. Even by Christmas 2022 is a respectable win. Anything into 2023 will be challenging from a PR perspective especially getting deeper into 2023. Fingers crossed
 

Johnny Au

Senior Member
Member Bio
Joined
Apr 4, 2010
Messages
8,207
Reaction score
10,311
Location
Near the North York, York, & Old Toronto tripoint
Here's Part 2 of 2 taken from Oakwood station on October 27, 2021

Secondary entrance:

IMG_2345.jpg
IMG_2346.jpg
IMG_2347.jpg
 

smallspy

Senior Member
Member Bio
Joined
Nov 27, 2009
Messages
4,932
Reaction score
5,903

Actually they are making massive progress at eglinton. Almost done the station box, and are finishing with track installation. They actually might get it done next year.
I know that they are making massive progress there. I live close by and go past it quite regularly.

But they still haven't started building anything above ground there, and that was what the question was about.

Dan
 
  • Like
Reactions: max

Allandale25

Senior Member
Member Bio
Joined
Oct 19, 2007
Messages
7,490
Reaction score
10,850
 

cplchanb

Senior Member
Member Bio
Joined
Apr 15, 2010
Messages
2,320
Reaction score
1,511
Hopefully they'll keep that gold clip on the track as an Easter egg for riders to spot!
 

toronto647

Active Member
Member Bio
Joined
Mar 7, 2020
Messages
516
Reaction score
983
X


Just giving them a year to finish up all the stations.
The overhead catenary system (the wires that power the trains), train signals, communications systems are not expected to be done anytime soon and "will continue into 2022". Once that is done testing of the whole line can commence meaning full line testing probably wont start until Summer 2022 at the earliest.
 

W. K. Lis

Superstar
Member Bio
Joined
Dec 24, 2007
Messages
21,998
Reaction score
12,131
Location
Toronto, ON, CAN, Terra, Sol, Milky Way
The overhead catenary system (the wires that power the trains), train signals, communications systems are not expected to be done anytime soon and "will continue into 2022". Once that is done testing of the whole line can commence meaning full line testing probably wont start until Summer 2022 at the earliest.
They're already working on the catenary system. I would expect the first trains through by the end of 2021. The finishings (tiles, wall coverings, windows, etc.) of the stations will be done early next year, with testing over the summer.
 

W. K. Lis

Superstar
Member Bio
Joined
Dec 24, 2007
Messages
21,998
Reaction score
12,131
Location
Toronto, ON, CAN, Terra, Sol, Milky Way
Doesn't Nov. 2022 leave quite a bit of time to finish all that stuff? Next fall seems like a reasonable goal to me.
As the stations themselves get finished one by one, they'll add the workers to the remaining stations. Which will speed things up. A couple of stations near me are just about finished, and just need cleaning up.
 

drum118

Superstar
Member Bio
Joined
Apr 24, 2007
Messages
18,010
Reaction score
16,506
Location
Mississauga, where cars rule city growth
As the stations themselves get finished one by one, they'll add the workers to the remaining stations. Which will speed things up. A couple of stations near me are just about finished, and just need cleaning up.
From what I been told, very little to be done inside for Keelesdale and Mount Dennis with Caledonia being early 2022.

Keelesdale is basely finish on the outside, with Mount Dennis by year end. Caledonia will be by Q1 in 2022 subject to weather. Kennedy Station surface area could be finish by year end and no idea on the station itself. The Science Centre Station is almost complete now.

The rest I can't speak to as I don't follow them nor visit other than Yonge.
 