technically, never. The Bloor Danforth line did open in stages though, between 1966 and 1968. The original line which opened in 1966 was only from Keele to Woodbine, with subsequent extensions to Islington and Warden opening 2 years later. They were all part of a single project from the start however, so I'm not sure they count.

With the Woodbine and Keele terminals designed as temporary end points, with temporary streetcar shuttle loops too. I agree, it was all part of the same, staged project. Same with the temporary York Mills terminal for the Yonge Subway extension to Finch.
 

drum118

Superstar
Member Bio
Joined
Apr 24, 2007
Messages
18,126
Reaction score
16,688
Location
Mississauga, where cars rule city growth
Honestly I didn't know they staggered the launches like they do for twin tunnel boring machines.

Also, I really hope they put a map of progress in the website, it'll make for a good visual aid.
I thought they did both TBM At the same time as the pit area was empty in June when I last saw it. There was 2 TBM in various stages being built when I had my first look at the site.

It common to open things up in phases to get something up and running ASP when its a long and stage from day one.
 

Steve X

Senior Member
Member Bio
Joined
Jan 16, 2016
Messages
2,394
Reaction score
1,964
Honestly I didn't know they staggered the launches like they do for twin tunnel boring machines.

Also, I really hope they put a map of progress in the website, it'll make for a good visual aid.
Let's generate twice the vibration by having both run side by side. Probably not as safe and plus they can sort out any logistical problems with one launch first before another.
 

JSF-1

Active Member
Member Bio
Joined
Feb 27, 2018
Messages
631
Reaction score
1,349
Location
Woburn
technically, never. The Bloor Danforth line did open in stages though, between 1966 and 1968. The original line which opened in 1966 was only from Keele to Woodbine, with subsequent extensions to Islington and Warden opening 2 years later. They were all part of a single project from the start however, so I'm not sure they count.
This technically isn't true. Work on the extensions to Islington and Warden started on March 1, 1965 a little under a year before the first phase of Line 2 opened in 1966. Now the timelines between Line 2 and Line 5 will be very different since the extension of Line 2 to Islington and Warden only took 3 years to build owing to the use of cut-and-cover as well as at-grade construction where possible.
 

Amare

Senior Member
Member Bio
Joined
Feb 4, 2015
Messages
4,669
Reaction score
6,956
Location
Toronto
Not yet. Looking through the answers provided by Metrolinx in the website, it seems like they want to do a community survey to decide the names.
Yeah right a "community survey". After they went through their consultants to name the existing Crosstown stations, dont buy that croc of S*** from them.
 

jcam

Active Member
Member Bio
Joined
May 30, 2011
Messages
544
Reaction score
309
Here are some snaps from the presentation on July 26. I've only included the newer renderings not previously shared.

View attachment 417795

View attachment 417796

View attachment 417797

View attachment 417798

View attachment 417802

View attachment 417803

Overall, I think nothing majorly new in this presentation than what was already provided. I feel like this presentation is more tuned towards the NIMBY's that are asking to bury the line through the Scarlett to Jane section.
The reference to automated trains seems strange, because I thought this is an extension of CrossTown, and I'm not sure its surface route could handle automated trains, is it, at least in the short term?
 

generalcanada

Active Member
Member Bio
Joined
Feb 19, 2020
Messages
531
Reaction score
1,063
The reference to automated trains seems strange, because I thought this is an extension of CrossTown, and I'm not sure its surface route could handle automated trains, is it, at least in the short term?
remember crosstown has full ATC in the underground portion, if its grade separated i dont see why it cant be full atc here too.
 

Steve X

Senior Member
Member Bio
Joined
Jan 16, 2016
Messages
2,394
Reaction score
1,964
The reference to automated trains seems strange, because I thought this is an extension of CrossTown, and I'm not sure its surface route could handle automated trains, is it, at least in the short term?
They want the entire Eg West to be ATO which can't be done if they placed it side by side or in the middle on Eglinton with no fencing.
 