Toronto Cove at Waterways | 58.52m | 16s | Conservatory Group | Richmond Architects

February 26th, 2016. Rebars and formwork have started.

image.jpeg
 

Attachments

  • image.jpeg
    image.jpeg
    2.5 MB · Views: 1,375
Earlier today:

DSC01297.jpg
DSC01299.jpg
DSC01301.jpg


42
 

Attachments

  • DSC01297.jpg
    DSC01297.jpg
    370.7 KB · Views: 1,130
  • DSC01299.jpg
    DSC01299.jpg
    283.9 KB · Views: 1,150
  • DSC01301.jpg
    DSC01301.jpg
    453.1 KB · Views: 1,164
Yesterday, from a little higher up than usual:

DSC01400.jpg
DSC01408.jpg
DSC01417.jpg
DSC01418.jpg


Gravel being shot into the pit, to be levelled in advance of the the lowest garage slab being poured there.
DSC01419.jpg


42
 

Attachments

  • DSC01400.jpg
    DSC01400.jpg
    772.5 KB · Views: 1,046
  • DSC01408.jpg
    DSC01408.jpg
    508.1 KB · Views: 1,038
  • DSC01417.jpg
    DSC01417.jpg
    958 KB · Views: 1,083
  • DSC01418.jpg
    DSC01418.jpg
    854.9 KB · Views: 1,038
  • DSC01419.jpg
    DSC01419.jpg
    807.5 KB · Views: 1,051
Here it is as of yesterday evening from Marine Parade:

DSC04668.jpg

DSC04667.jpg

DSC04666.jpg


42
 

Attachments

  • DSC04666.jpg
    DSC04666.jpg
    414.8 KB · Views: 863
  • DSC04667.jpg
    DSC04667.jpg
    676.5 KB · Views: 874
  • DSC04668.jpg
    DSC04668.jpg
    301.4 KB · Views: 872

Back
Top