Toronto Clare R. Copeland Transformer Station | ?m | ?s | Toronto Hydro | Arcadis

The brick work and windows look pretty high quality to my eye.

20170516_193538_HDR_resized.jpg
cropped.jpg
 

Attachments

  • 20170516_193538_HDR_resized.jpg
    20170516_193538_HDR_resized.jpg
    1.7 MB · Views: 446
  • cropped.jpg
    cropped.jpg
    872 KB · Views: 425
The original bricks were dismantled then stored during construction. See post #15 in this thread for a fuller explanation.

42
 
They haven't even begun to build the park! It'll be lucky if this park opens in Summer 2018...
IMG_9499.JPG
IMG_9502.JPG
 

Attachments

  • IMG_9499.JPG
    IMG_9499.JPG
    2.2 MB · Views: 457
  • IMG_9502.JPG
    IMG_9502.JPG
    2.3 MB · Views: 428
They haven't even begun to build the park! It'll be lucky if this park opens in summer 2018

It probably won't be ready until next year and I have little doubt it went way over budget. The good news is infrastructure is very rarely ever nice to look at and despite the delays and huge cost, this looks like it's going to be a great space once complete!
 
Perhaps they're currently assembling each brick, grain, by grain, by grain...by grain...by...
That honestly sounds like a quicker process than whatever the hell is happening here.
 

Back
Top