Toronto Bianca Condos | 37.79m | 9s | Tridel | Teeple Architects

upload_2018-4-5_17-46-0.png
 

Attachments

  • upload_2018-4-5_17-46-0.png
    upload_2018-4-5_17-46-0.png
    75 KB · Views: 2,343
It was not gone at that point... there is still this chunk left:

bia1.jpg


It should be gone by end of week I think.
 
  • Like
Reactions: PMT
Partially shown in ProjectEnd's first picture I was driving past the site the other day and noticed one of the excavators had what looked like a giant lobster claw attachment that the kid in me found very appealing.
 
They've been doing some soil remediation maybe? ... I've noticed they've dug down about 15 feet and infilled with new soil in a couple spots near the rail line.
 

Back
Top