Toronto Backyard Neighbourhood Condos | 24.99m | 10s | VANDYK | Kohn

So, here's what I saw yesterday:

DSC09769.jpg
DSC09768.jpg
DSC09770.jpg
DSC09774.jpg


Not sure what's going in here at the corner, but nothing in there yet.

DSC09771.jpg


Further in by the northeast corner of the building beside the access to the Stonegate Community Health Centre, a pharmacy is going in.

DSC09772.jpg


Facing Berry Road is this sliding door (and you can see through the glass to the Bell Manor Road frontage in behind, I am pretty sure that this is where the food coop is going in. No interior fit out there yet either, though.

DSC09773.jpg


That's it for now.

42
 

Attachments

  • DSC09768.jpg
    DSC09768.jpg
    327.8 KB · Views: 1,655
  • DSC09769.jpg
    DSC09769.jpg
    239.6 KB · Views: 1,629
  • DSC09770.jpg
    DSC09770.jpg
    321.5 KB · Views: 1,660
  • DSC09771.jpg
    DSC09771.jpg
    304.2 KB · Views: 1,615
  • DSC09772.jpg
    DSC09772.jpg
    298.5 KB · Views: 1,612
  • DSC09773.jpg
    DSC09773.jpg
    397.8 KB · Views: 1,608
  • DSC09774.jpg
    DSC09774.jpg
    391 KB · Views: 1,584
The Berry Road food co-op hopes to open in June 2019. Call for volunteers at AGM is on 25 Jan 2019. Also, while VanDyk has been generous Berry Road food co-op is on fundrazr to raise $50k. An awesome opportunity to show those wanker monopoly-food-distribution giants that a neighbourhood don't need your sorry-assed over produced junk food.

https://www.berryroadfood.coop/
 
There haven't been any photos from this construction site for a couple of months. In that time, the 1st condo has topped off (or nearly topped off) judging by the models, unless I'm not understanding the models correctly.

Looking North-West at the intersection of Stephen and Berry:
IMG_20190105_164627.jpg
IMG_20190105_164657.jpg

IMG_20190105_164728.jpg


Looking South down Stephen, commercial building that just completed to the right, Eau du Soleil down the road in the distance:

IMG_20190105_164854.jpg
IMG_20190105_164945.jpg
IMG_20190105_165023.jpg


South-West corner of the condo:

IMG_20190105_165325.jpg


Moving onto the commercial building, new businesses moving in:

IMG_20190105_165814.jpg
IMG_20190105_165904.jpg
IMG_20190105_165931.jpg
IMG_20190105_165959.jpg


South-West corner, where Berry Rd. Food Co-op hopefully happens:

IMG_20190105_170054.jpg

IMG_20190105_170131.jpg
 

Attachments

  • IMG_20190105_165931.jpg
    IMG_20190105_165931.jpg
    240.5 KB · Views: 366
Considering the crane has come down I would have thought it be more advanced, looks like a lot of work yet to be done.
 
Considering the crane has come down I would have thought it be more advanced, looks like a lot of work yet to be done.
Crane being down mostly just means that formwork hoists are done and HVAC equipment is already up top. Doesn't really have much to do with cladding or interior finishes.
 

Back
Top