Toronto Art Shoppe Condos | 98.75m | 28s | Freed | a—A

From Saturday: becoming visible from downtown

P1070360.JPG
 

Attachments

  • P1070360.JPG
    P1070360.JPG
    134.8 KB · Views: 2,114
it looks like they're going to be able to seal all the podium levels (lofts, etc) with glass and that will get them working on the interiors.. i wonder what the progress is on the tower itself.. i wish we have shots from top now..
 
Nov 7th Update from the Builder:
  • The tower continues to rise, with concrete being poured on the 17th floor (Level 20)
  • The pool’s structure is nearing completion on the 13th floor (Level 16)
  • Precast panel installation continues up to the 10th floor (Level 13)
  • Window installation continues up to the 9th floor (Level 12)
1542123892649.png
1542123919114.png
 
This is going to be one incredible looking building IMHO. Any word yet on retail as well as the 24/7 dining I've been hearing about?
 
I just read an article about Habitat in Montreal (in 'Dezeen') which was built 50 years ago. It has held up very well and is still iconic.I mention this because 'Art Shoppe' remind me a little of Habitat with the cubic feel in the podium.
 

Back
Top