Toronto Aquavista at Bayside | 46.94m | 13s | Tridel | Arquitectonica

May 18th


Starting to rise finally.

IMG_2535.JPG
 

Attachments

  • IMG_2535.JPG
    IMG_2535.JPG
    2.2 MB · Views: 609
First, as a more horizontal building, we're looking at a large footprint here. Second, podium floors always take longer than typical and repetitive tower floors to build, as they need to build each concrete form for the unique floor layout.

42
 
A few pictures taken with my cell yesterday on my way to the Desire Lines Exhibition organized in partnership with Waterfront Toronto, and held in the former Monde presentation Centre at 291 Lake Shore East. I've you've always wondered what the space looks like inside, this is your chance, and they kept some of the decor from the model suite.
Anyways, it is exciting to see the neighbourhood coming together:
panobayfront.PNG
bayfront.PNG
aquasomething.PNG
 

Attachments

  • aquasomething.PNG
    aquasomething.PNG
    2 MB · Views: 506
  • bayfront.PNG
    bayfront.PNG
    2.9 MB · Views: 602
  • panobayfront.PNG
    panobayfront.PNG
    1.5 MB · Views: 553
Last edited:
IMG_6266.JPG
IMG_6265.JPG
IMG_6269.JPG
IMG_6263.JPG
 

Attachments

  • IMG_6266.JPG
    IMG_6266.JPG
    266.8 KB · Views: 454
  • IMG_6269.JPG
    IMG_6269.JPG
    397.8 KB · Views: 481
  • IMG_6265.JPG
    IMG_6265.JPG
    319.8 KB · Views: 478
  • IMG_6263.JPG
    IMG_6263.JPG
    415.1 KB · Views: 498

Back
Top