Toronto 80 Bloor Street West | 263.4m | 78s | Krugarand | Arcadis

What have they appealed? Surely the period to appeal the development proposal from 2014 has long ended.
 
How do you know that?

Why are you giving me a hard time?

I don't know and that's why I asked. The last post is from 2014 for a 200 metre tall proposal. The window to appeal to the OMB is about 3 week for most if not all situations. Pretty basic stuff.
 
It is quite a recent appeal… so I suppose that they are appealing based on the proposal we know about, that it must be within an acceptable time frame, and that we will find out more once hearings have been scheduled.

42
 
The application status on the Dev App site is "Appeal Received" so I thought it was a recent appeal.
 
Existing

IMG_1072.JPG
 

Attachments

  • IMG_1072.JPG
    IMG_1072.JPG
    1.8 MB · Views: 774
They still have to build it (assuming the appeal is what you think it is in the first place)
 

Back
Top