Toronto 75 on The Esplanade | 99.97m | 29s | Harhay | a—A

P1210929.jpg


P1210933.jpg


P1210932.jpg
 
The last concrete pour.
590A52FE-8003-4DA7-8D32-76107E8DEDB5.jpeg


The DHW tanks and cooling tower were moved from the lower roof to the penthouse mechanical room.
8B1A4040-0A98-4F48-8758-60F441534C18.jpeg


Domestic hot water and heating boilers
80BEF980-B03C-4B9B-88D4-02231E14322A.jpeg


6515993A-DE80-4E2E-9F6E-6A73D7EE0221.jpeg


what’s behind door #1
2D03DF9C-7E88-4A2F-91E6-F815F51BB4EF.jpeg


This was fun to watch.
31554277-15D9-47E2-8CB6-FCB1AA13F5B6.jpeg

I wonder how long these tarps will last.
 
Last edited:

Back
Top