Toronto 400 King West | 157.37m | 48s | Plaza | BDP Quadrangle

oct22
IMG_4113.jpg
 
Last edited:
How long till occupancy starts do you guys think?
I’m going to guess a year until floor 47 is hit, then a year and three months until the plaza releases the lowest floors for occupancy. I’m just a layperson though, a construction manager would know infinitely more.
 
How / why are they reducing the number of parking spaces in an already-completed garage?

Its a 2 space reduction, offset by an increase in bike parking.

Additionally:

The parking here was required at a rate of 0.15 spaces per unit in the by-law.

The additional units proposed would trigger a demand for additional spaces if there were no variance.

What is being sought is to reduce the requirement to 0.14 spaces per unit.

*****