Toronto Yonge & Rosehill | 172.3m | 50s | Originate | Turner Fleischer

April 2, 2021


20210402_105926.jpg
20210402_110014.jpg
 
Just looking at this, and had the realization that they were working deeper in the ground before, and then filled it back in.

View attachment 315222
- my pic
That's a pretty regular occurrence at construction sites in town: following demolition, the site needs to be flat for drilling rigs to get working on the shoring walls. (Not sure what the other drilling rig was accomplishing in that on corner before that.)

42
 
This site is so dormant..........it's growing weeds!

Photos taken December 26th, 2021:

Looks like there's some contamination testing going on??

1640565368204.png


1640565383625.png
 
Hmm, so ya got me looking into the permits for this one.

No shoring permit has been issued yet.

1645914255149.png


****

They have, however, filed for the building permits:

1645914297343.png


So there is indeed a plan of action; though not much yet permitted action!
 
Nothing much has changed here, give or take a weed or two, since @Edward Skira 's last visit in May:

Photo taken December 29th, 2022:

DSC00537.JPG


DSC00536.JPG


DSC00535.JPG


So, I went and looked up the permits here again........

They still don't have their shoring permit in place. :O

Their construction phasing schedule, posted above, had them on below-grade forms starting in Nov '22. The timeline slippage w/this one is heavy. At least 8 months behind!
 

Back
Top