Toronto 109OZ Condos | 20.12m | 6s | Reserve Properties | RAW Design

This is still before the OMB. Reserve put in their application well before the passing of that OPA so they will very likely be grandfathered in at 6s. Fortunately, 109oz will provide precedent for other projects in the area to match its height making this whole, silly and expensive exercise a boatload of gravy.
 
9 August 2014: Getting ready for a nimby party?
ImHvJEg.jpg
 
Application: New Building Status: Not Started

Location: 109-111 OSSINGTON AVE
TORONTO ON M6J 2Z2

Ward 19: Trinity-Spadina

Application#: 14 246981 BLD 00 NB Accepted Date: Nov 3, 2014

Project: Mixed Use/Res w Non Res New Building

Description: Proposal to construct a 6 storey condo with 86 residential units, commercial spaces on ground floor, and 2 levels of underground parking.
 
Application: Partial Permit Status: Not Started

Location: 109-111 OSSINGTON AVE
TORONTO ON M6J 2Z2

Ward 19: Trinity-Spadina

Application#: 14 246981 STR 00 PP Accepted Date: Jan 22, 2015

Project: Mixed Use/Res w Non Res Partial Permit - Structural Framing

Description: Part Permit - Proposal to construct a 6 storey condo with 87 residential units, commercial spaces on ground floor, and 2 levels of underground parking.
 
From March 11th:

IMG_20150311_124656.jpg

Demo in progress from a week and a half ago.
 

Attachments

  • IMG_20150311_124656.jpg
    IMG_20150311_124656.jpg
    1.4 MB · Views: 1,779
I think this may be the fastest build I've ever seen in Toronto.
 

Back
Top