News   Apr 19, 2024
 1.5K     0 
News   Apr 19, 2024
 800     2 
News   Apr 19, 2024
 1.3K     3 

Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

If you toll the 401 & QEW they won't have much choice. But the 407 has different objectives--profit maximization rather than transportation efficiency+cost recovery. 407 charges way more than marginal cost to it, particularly off-peak when capacity is not an issue.
 
I should have rephrased my earlier post. Most trucking lines will offer 407 services (at a premium), but the customers (Wal-mart, Canadian Tire) always want the cheapest form of shipping possible. This way they can offer lower prices at their stores. Toll all the highways and we'll either have backed up side roads as trucks avoid the newly tolled highways, or force trucks to drive on tolled highways and we pay higher prices for goods at the stores.
 
There has been some talk that everyone will pay a toll regardless where they drive and will be base on distance travel. This includes all city roads or roads not a highway.

Will that happen is unknown at this time.

There are a number of truck drivers in my family including one owning their own company that is small. They do runs call on time delivery to the point if they are late it will effect the production run of the company they are delivery stuff to in the first place. None of them will use the 407 and prefer to get around paying tolls in the US. This is an example where companies did away with stock piling as the space became too expensive to have.

If the 401 was toll, it would be between KW and Oshawa as its the heavies travel section.
 
Had a family emergency that caused me to go to London today. Noticed the HOV frames between 25-8 are gone with no HOV lane and that great.

Creditview is missing 2 bathtubs on the north side that could be in place this week or next. Once in place, the 401 has to be close on a Sat night so the 4 centre bathtubs can be place to connect both side. of the 401 that should be open between 8 am to noon Sunday. Saw no signs for any road closure.

Got on the 401 at Mavis with the collectors lane moving at a snail pace while the express was wide open and fast moving. Once past the pinch point the the river, traffic was moving at speed limit.

A lot of has taken place since my last trip,

12 lanes will be come 10 lanes east of Winston Churchill as the bridge was built for 10 lanes like the 407 bridges.

The westbound collector bridge over the Orangeville line 90% complete
 
The other reason trucking has taken over a significant portion of freight movement is because trucking is heavily subsidized, it pays nowhere near as much as it should for air pollution or road wear. Meanwhile rail companies have to pay to maintain their own roads, and even pay property taxes on it.
vehicle-weight-and-damage-chart.jpg
 
so what are the plans here collectors till milton?
Collectors will be between 407 and James Snow to allow access to/from 407 and Trafalgar Rd and east of Winston Churchill to 427
 
Will there be preparations put in place for the future construction of the new "Western GTA", 400 series highway starting at the 401/407 junction?
 
Will there be preparations put in place for the future construction of the new "Western GTA", 400 series highway starting at the 401/407 junction?
I really have no idea if there any provision for a connection to Western GTA Hwy under the current contract.
 
Will there be preparations put in place for the future construction of the new "Western GTA", 400 series highway starting at the 401/407 junction?

No. The 401 will actually squeeze under the 407 interchange because the bridges were not built long enough for a collector-express configuration. Any redesign of the interchange allowing connections to a new highway to the north might do something to mitigate this, including new overpasses for the missing collector lanes.

Right now they're just maxing out the design specs of the interchange- the 407 is also be widened through here. The only addition is a basket-weave flyover to the west of the junction.
 
Just saw that the new westbound express lanes are now open. Including an awkward exit to Mavis and no real signage indicating that there’s express lanes now. Not sure how it works further because we got off at Mavis. Must have happened overnight because they weren’t in that configuration when I was driving home last night (401 was closed completely at Mavis actually).
 
Sept 20
It looks like there will be a lane change from the collectors to the express lanes east of Mavis and need to take some shots from the bridges to confirm it.

Once you enter the east bound express lanes, look like you can't transfer to the collectors until Dixie.

Looks like the 401 was on detour Sat night for the placement of the centre beams for Creditview overpass as they are in place tonight, but not 100% bolted. The bottom of the bathtubs are about 4 feet above the top of the current bridge and really going to increase the clearance under the new overpass. Can't get good shots looking east with the bathtubs in place.

3 metal caissons on each side of the Credit River for both collectors new bridge support are in place with pier support frames to be place in the caisson to pour the supports.

The new off ramp from Mississauga Rd to the eastbound collectors lanes as well the collectors lanes have asphalt and stop short of the RR bridge being form.

A lot of work has taken place since my last trip on June 29 as a very fast pace.

Work is now on the west side of 25 to where it will start/end.
50365172673_e33151f6d3_b.jpg

50365869181_220d7bb0a1_b.jpg

50366025907_5fee48f52e_b.jpg

50365869421_ca99416d88_b.jpg

50365173348_02ce025802_b.jpg

50365172673_e33151f6d3_b.jpg

50365172393_d09b257166_b.jpg

50365868916_ff7a40f469_b.jpg

50365172268_a72871c668_b.jpg

50365172153_d50df1dd90_b.jpg

50365868346_a7f4999cb2_b.jpg

50365171823_8ba2753c27_b.jpg

50365171158_f47b3a1d6e_b.jpg

50366024082_b6b7027040_b.jpg

50365870006_efbe7c1a1f_b.jpg

50365870406_25ece05402_b.jpg
 

Back
Top