Mississauga Pinnacle Uptown: Gemma Condos | 120.3m | 35s | Pinnacle | Richmond Architects

Currently at-grade:
1.jpg
2.jpg
 
Oct 24
They have rebuilt and reopen the pathway on the north side now and more up on my site

Lot of wasted space because of NIMBY
53289334645_1689301e7a_b.jpg

53289333860_dc953ae42d_b.jpg

53289236779_a48e378a21_b.jpg

53288861596_d0efdf7850_b.jpg

53288860371_6c14713e9f_b.jpg

53288860116_14bc3f3ee4_b.jpg

53289110258_440539917f_b.jpg
 
Dec 6
@interchange42 The site has lost a crane and no idea when it happen
 

Back
Top