here's a mini-update of some of the ongoing sites at MCC:
Absolute Vision (absolute #3) from Meadows Blvd, topped out..
Some news from Marilyn: appears to be preparation for the concrete crane foundation (hole at centre)....
Entrance to One Park Tower...
circular drive with some sort of obelisk..
Excavation at Chicago site:
solstice..
retail on ground floor, there's supposed to be offices on the second floor...
eve, up to about 14 floors...
Absolute Vision (absolute #3) from Meadows Blvd, topped out..
Some news from Marilyn: appears to be preparation for the concrete crane foundation (hole at centre)....
Entrance to One Park Tower...
circular drive with some sort of obelisk..
Excavation at Chicago site:
solstice..
retail on ground floor, there's supposed to be offices on the second floor...
eve, up to about 14 floors...