here's a mini-update of some of the ongoing sites at MCC:

Absolute Vision (absolute #3) from Meadows Blvd, topped out..

mccfeb2403.jpg


mccfeb2404.jpg


mccfeb2405.jpg


mccfeb2407.jpg


Some news from Marilyn: appears to be preparation for the concrete crane foundation (hole at centre)....

mccfeb2406.jpg


Entrance to One Park Tower...

mccfeb2409.jpg


circular drive with some sort of obelisk..

mccfeb2410.jpg


mccfeb2411.jpg


Excavation at Chicago site:

mccfeb2412.jpg


solstice..

mccfeb2413.jpg


mccfeb2416.jpg


mccfeb2417.jpg


retail on ground floor, there's supposed to be offices on the second floor...

mccfeb2420.jpg


mccfeb2421.jpg


eve, up to about 14 floors...

mccfeb2422.jpg


mccfeb2423.jpg
 
thanks for the pics - it was a perfect weekend to get out and do some shots. love the grouping of buildings in that final pic...

on a side note you guys on the north side of the lake have gotten way more snow than us here in Niagara Falls. After today we were pretty much back to bare grass... I know, life in the Canadian Tropics is tough...
 