swampymudkip Active Member Member Bio Joined Dec 26, 2022 Messages 103 Reaction score 793 Location Markham Friday at 9:58 PM #1 The pre-consultation application for Remington Block 12 in Downtown Markham is underway. A 3 phase project with "5" towers total at 16, 26, 30, 32, and 36 stories. Site plan and model below:
The pre-consultation application for Remington Block 12 in Downtown Markham is underway. A 3 phase project with "5" towers total at 16, 26, 30, 32, and 36 stories. Site plan and model below: