ONGOING CONSTRUCTION:​



Median Removals and the Installation of Temporary Traffic Signals​



11cf5cf1-79f3-6e70-7b50-359ced7cde87.jpg
The removal of the remaining medians continues at the HWY 403 bridge as part of the structural bridge. This work is currently taking place at night when traffic levels are reduced.


Utilities, Roadways and Temporary Bus Platforms​



Utility works are currently progressing along Rathburn Road. This includes upgrades and relocation activities for sanitary installations.


4cb910c8-87dc-379d-b39c-cc26c1af1347.jpg
Utility works are expected to begin along Hurontario Street later this year. Crews are working double shifts at the City Centre Bus Terminal in order to accelerate the works and minimize impacts to Mississauga’s busiest transit hub.


To reduce the impacts of transit service disruptions during the day, some of this work will take place at night in coordination with MiWay. To minimize disruption to transit users, temporary bus platforms have also been installed along Rathburn Road in the area between City Centre Drive and Hammerson Drive.

Line painting for new traffic lanes configurations and the installation of temporary bus platforms are planned for November from Matthews Gate to Square One Drive. We encourage motorists to plan for delays. Please look out for signage along the roadway in advance of changes to traffic lane configuration.

Crews are currently working in the area between Fairview Road and Matthews Gate and are working towards overnight work at Central Parkway in early to mid-November.


Crews will take the following measures to limit overnight noise:
  • Regular active monitoring of noise and vibration to ensure they do not exceed provincial and municipal thresholds.
  • To muffle the noise created by portable generators, crews have encased the generators with a plywood barrier.
  • Crews have also been scheduling noisier activities towards the beginning of the night shift, whenever possible, to minimize disruption to neighbouring residents.


Safety​

Safety is our number one priority and a shared responsibility. Please note and follow construction signage as you walk, cycle or drive along Hurontario Street. If you have any questions or concerns, please feel free to reach out to Metrolinx Community Relations team at 416-202-7500 or email Peel@metrolinx.com.

For more updates and information on this project, and to get the latest news on what’s happening in Peel, subscribe to our newsletter: www.metrolinx.com/hurontariolrt


COMMUNITY ENGAGEMENT:​



6a63c740-402a-9aca-6139-9d756b8ddf2d.jpg
Our second Community Canvass of the year started this month, giving us a chance to touch base with businesses and commuters at temporary bus platforms along the corridor.


The purpose of this canvass is to find out how we can support businesses and commuters through construction, and what they are most excited about as the Hurontario LRT project progresses! So far, canvassers were able to engage with over 250 businesses, and over 100 commuters.

As construction progresses, we’ll be putting up “Shop Local” signage along Hurontario Street in addition to our directional signage and businesses are open signage.
Our Peel Community Relations team will continue to help residents and businesses virtually, but if you would like an in-person appointment, let us know via email at Peel@metrolinx.com. For more updates and information on this project, and to get the latest news on what’s happening in Peel, subscribe to our newsletter: www.metrolinx.com/hurontariolrt.
 

drum118

Superstar
Member Bio
Joined
Apr 24, 2007
Messages
17,383
Reaction score
14,114
Location
Mississauga, where cars rule city growth
On Wed I shot the area around the 403 and no photo thanks to the camera chapping out and loosing the shot. Back to the repair shop.

They were turning on the construction lights for the eastbound 403 off ramp. The overpass median has been removed, but need to be pave over.

Don't know if the median for the Rathbun overpass is to be remove as that overpass was rebuilt about 10 years ago or is needed to shift traffic next year when the 403 overpass is rebuilt. It should be to shift traffic a lot easier .

Saw no signs of any pier support work that supposed to started back in June.

On my trip to Brampton on Friday, had a look at the corridor to Steeles. Other than land clearing on the northside of 407, saw no work in Brampton.

The southbound lanes north of the 401 has or in the process of new curbs pour.

At Bristol, they where paving the median now construction lights installed and working. They have over a block of paving to do.
 

nfitz

Superstar
Member Bio
Joined
Nov 10, 2007
Messages
24,577
Reaction score
5,068
Location
Toronto
Please post the link, not something with Outlook protection imbedded in, that leads to Microsoft's website - and creates security warnings. This is the link you posted:

na01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.metrolinxengage.com%2FHuLRT&data=04%7C01%7C%7C9183c47084d24aea949308d9a885999c%7C84df9e7fe9f640afb435aaaaaaaaaaaa%7C1%7C0%7C637726114041994821%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=oI6JUKbBj0x0S6sXL7N9j2Zg4vubER%2FFUCItlrFyLnM%3D&reserved=0

Rather than www.metrolinxengage.com/en/engagement-initiatives/hurontario-light-rail-transit-project
 

drum118

Superstar
Member Bio
Joined
Apr 24, 2007
Messages
17,383
Reaction score
14,114
Location
Mississauga, where cars rule city growth
Please post the link, not something with Outlook protection imbedded in, that leads to Microsoft's website - and creates security warnings. This is the link you posted:

na01.safelinks.protection.outlook.com/?url=http%3A%2F%2Fwww.metrolinxengage.com%2FHuLRT&data=04%7C01%7C%7C9183c47084d24aea949308d9a885999c%7C84df9e7fe9f640afb435aaaaaaaaaaaa%7C1%7C0%7C637726114041994821%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=oI6JUKbBj0x0S6sXL7N9j2Zg4vubER%2FFUCItlrFyLnM%3D&reserved=0

Rather than www.metrolinxengage.com/en/engagement-initiatives/hurontario-light-rail-transit-project
That what was sent to me and had no issue with the link

 

Krypto98

Active Member
Member Bio
Joined
Jan 19, 2019
Messages
274
Reaction score
507
That what was sent to me and had no issue with the link

If you use chrome or edge, typically it gets no warnings but firefox and safari are picky about these things
 

drum118

Superstar
Member Bio
Joined
Apr 24, 2007
Messages
17,383
Reaction score
14,114
Location
Mississauga, where cars rule city growth
If you use chrome or edge, typically it gets no warnings but firefox and safari are picky about these things
I got something on the project and it kill my mail account in most browsers that I have to reboot the system and still can't read it.
 

Top