is the Fairview LRT stop located at Fairview or at Central Parkway?
The last I heard, Central Parkway will be the stop location. Have requested full stop locations as well asked if Steeles will be relocated to the north side as originally plan. Big mistake if not relocated now as we are only talking about 500' of guideway and track. Extra cost added to contract by change order or Brampton picks up the cost since they caused the problem in the first place.
 

Coolstar

Senior Member
Member Bio
Joined
Mar 22, 2019
Messages
1,005
Reaction score
1,714
Location
Toronto
That's my thought and what I was expecting to happen. Hopefully, they change it.
They also have an O symbol proposed.
1611532742975.png
 

ARG1

Active Member
Member Bio
Joined
May 28, 2020
Messages
616
Reaction score
1,594
Location
North Toronto
They also have an O symbol proposed.
View attachment 295936
AFAIK that's not the actual symbol. Both the Hurontario and Hamilton LRT also have a 0 as the symbol shown. I think Metrolinx simply doesn't want to commit to confirming the Line number at this stage. Not to mention it says in the document that the name and number is subject to change.
 

KhalilHeron

Active Member
Member Bio
Joined
Dec 5, 2020
Messages
117
Reaction score
230
Location
Scarborough
AFAIK that's not the actual symbol. Both the Hurontario and Hamilton LRT also have a 0 as the symbol shown. I think Metrolinx simply doesn't want to commit to confirming the Line number at this stage. Not to mention it says in the document that the name and number is subject to change.
That's actually a graphic from a different document I believe that uses an O instead of a 0. I Still don't think they're going to use it or it was meant to show that they would but it's not the placeholder from the design document I'm pretty sure.
 

Coolstar

Senior Member
Member Bio
Joined
Mar 22, 2019
Messages
1,005
Reaction score
1,714
Location
Toronto
That's actually a graphic from a different document I believe that uses an O instead of a 0. I Still don't think they're going to use it or it was meant to show that they would but it's not the placeholder from the design document I'm pretty sure.
They shouldn't. Using Line 3's number makes the most sense. Nothing is final at this point however.
 

Streety McCarface

Senior Member
Member Bio
Joined
Dec 6, 2017
Messages
2,061
Reaction score
2,094

KhalilHeron

Active Member
Member Bio
Joined
Dec 5, 2020
Messages
117
Reaction score
230
Location
Scarborough
Stick with the TTC font...Why waste millions of dollars changing all the maps in the name of accessibility when additional elevators and ramps are much better for said accessibility?
I agree they should stick with the current fonts but I mean they need to change all the maps when they add elevators and ramps anyway...
 

BhadPetrov

Active Member
Member Bio
Joined
Feb 28, 2019
Messages
138
Reaction score
150
Location
Treaty Territory of The Mississaugas of the Credit
I read some of the report but they did include the TTC font as an "alternative" font that would be used in the system, I also like the unique font so i was somewhat happy it was included

I found it interesting that Metrolinx is thinking about implementing a lettering system for the GO lines, similar to the Paris RER. It would be a letter on a coloured square on a black background, similar to the current subway/LRT signage.

I'm a little surprised how Metrolinx has yet to come up with a unified signage, symbols and names for the various BRT routes in the region and the more that will be built region.
 

H4F33Z

Active Member
Member Bio
Joined
Apr 11, 2019
Messages
318
Reaction score
634
Location
Thorncliffe Park
I think the problem going forward is that how do we distinguish between the metrolinx design scheme and each city's own transit design scheme. Go lines currently are run by Metrolinx but now Metrolinx is pushing their design scheme onto every new line they're overseeing. This might be a good thing and a bad thing. Good reason is that it unifies the design language on their new projects, but bad reason is that now people are going to be confused on which lines are run by metrolinx, ttc, and every other agency. If we want to unify design language for all of GTA, we're going to have to put the "T" on every single station and stop in the GTA. It's not even helpful because there is no mega transit agency that takes the responsibility of every transit agency, heck, we don't even have fare integration yet.

What's the point of this. Metrolinx doesn't have integration at all, and just wants to do some thing because it looks cool on a paper and map, but just makes things more confusing.
 

ARG1

Active Member
Member Bio
Joined
May 28, 2020
Messages
616
Reaction score
1,594
Location
North Toronto
I think the problem going forward is that how do we distinguish between the metrolinx design scheme and each city's own transit design scheme. Go lines currently are run by Metrolinx but now Metrolinx is pushing their design scheme onto every new line they're overseeing. This might be a good thing and a bad thing. Good reason is that it unifies the design language on their new projects, but bad reason is that now people are going to be confused on which lines are run by metrolinx, ttc, and every other agency. If we want to unify design language for all of GTA, we're going to have to put the "T" on every single station and stop in the GTA. It's not even helpful because there is no mega transit agency that takes the responsibility of every transit agency, heck, we don't even have fare integration yet.

What's the point of this. Metrolinx doesn't have integration at all, and just wants to do some thing because it looks cool on a paper and map, but just makes things more confusing.
First, the unified signage does differentiate transit agencies. 2nd, Metrolinx is working on fare integration, I think Metrolinx is quite well aware how important fare integration is to their plans, and stuff like GO Expansion and unified signage definitely wouldn't be pushed if they weren't working on fare integration.
 