I’m talking tear down only. If they can tear down that section in 2 months then they can tear out the SRT ROW (Kennedy-Ellesmere) in the same amount of time. Add in tearing out Lawrence East/Ellesmere stations and paving the entire ROW it shouldn’t take more than 6-8 months.Are you including paving over in the tear down?
8 years if you take the dates from Waterfront Toronto (2016-2024). Arguably the process started before 2016. 2016 is just when city council chose Hybrid Option 3
2 months if you are only interested in the Logan ramp demolition start to end
City of Toronto and Waterfront Toronto to begin construction of Lake Shore Boulevard East project
News Release August 20, 2021 The City of Toronto and Waterfront Toronto today announced construction details of the planned Lake Shore Boulevard East project, including removal of the Logan Avenue ramp at the most eastern portion of the Gardiner Expressway, as part of both the Gardiner...www.toronto.ca
Thats assuming the concrete rail bed can just be paved over and not totally ripped out and rebuilt.