darth_freeman
Active Member
Regardless, a one stop Subway to STC and the Eglinton-LRT extension is by far better than a three stop subway to STC.
They are finding anyway to try and justify Smart Track.
Curiouser and curiouser. I'm more than a little baffled by this situation. That is a very expensive and long subway run. If we can only afford 1 stop of subway, why not go back to the original LRT plan anyway? Would we even be able to get rid of the SRT with this plan?Lol wat? $2.5 billion for a single stop. Ouch.
I do like the Scarborough-Malvern LRT being put back on the table. That shit was approved by the city and the province back 8 years ago. It's shovel ready.
Curiouser and curiouser. I'm more than a little baffled by this situation. That is a very expensive and long subway run. If we can only afford 1 stop of subway, why not go back to the original LRT plan anyway? Would we even be able to get rid of the SRT with this plan?
Exactly... Not sure the province is pleased by all of this and neither should Scarborough residents. They should use the savings from the Eastern part of ST to secure the subway to Sheppard Avenue East which makes way more sense as a terminal station by crossing the 401.
I really doubt this will fly at City Council and I expect a major push back from the province. The city opting out meant a "Province" extension to Scarborough Town Center including a stop at Lawrence East. Politically, the Liberals along with local councillors will deem it unacceptable and I could see the province going to the Feds for the missing funds and/or taking over that file completely. They won't tolerate another flip flop nor should they for another mayor meddling in transit projects...again.
Notice that the Sheppard E LRT is officially dead ("Rapid Transit - to be determined" along Sheppard E)
On the contrary...Just like the phoenix...Sheppard Subway might raise from it's ashes to connect to STC
Just imagine how cheap we could build the 9-km if we just built a single station at Scarborough Centre....Sheppard Subway might raise from it's ashes to connect to STC
A 6-km subway extension, underneath the Scarborough Hospital at Lawrence & McCowan, with no stop?
Perhaps the city really does hate Scarborough!
On the bright side, suddenly the Transit City Scarborough-Malvern LRT is back on the table.
Just imagine how cheap we could build the 9-km if we just built a single station at Scarborough Centre.
Anyone else feel like they're using the same playbook they just used with the Eglinton West SmartTrack spur to kill it? By that I mean propose a "modification" (or a price tag) that's so ridiculous that it justfies throwing the entire plan out in favour of something else? I kinda get that feeling. It's much harder to kill a semi-justifiable Scarborough Subway than it is to kill a completely unjustifiable one. They just made it an unjustifiable one.