Crosstown LRT | Metrolinx

H4F33Z

Active Member
Member Bio
Joined
Apr 11, 2019
Messages
357
Reaction score
831
Location
Thorncliffe Park
Image Dump of the stations from Don Mills-Kennedy

Science Centre (no update from last time and forgot pictures of bus terminal but works going well)
IMG-3912.jpg

IMG-3916.jpg

Aga Khan (no update)
IMG-3918.jpg

IMG-3920.jpg

IMG-3921.jpg



Wynford (prep for new crosswalk/traffic signal for station access)
IMG-3997.jpg

IMG-3998.jpg


Sloane (dot matrix displays installed)
IMG-4002.jpg

IMG-4005.jpg


O'Connor (dot matrix displays installed. Fun fact! From what i can tell, this'll be the only stop where you can access it from two different intersections, Victoria Park Avenue and Eglinton Square!)
IMG-4007.jpg

IMG-4009.jpg

IMG-4010.jpg


Pharmacy (no major update other than curb reconstruction and median island)
IMG-4014.jpg


Hakimi-Lebovic (not much of interest)
IMG-4015.jpg

IMG-4017.jpg


Continued on next post...
 

H4F33Z

Active Member
Member Bio
Joined
Apr 11, 2019
Messages
357
Reaction score
831
Location
Thorncliffe Park
Golden Mile (again, nothing of interest other than median island and curb works)
IMG-4018.jpg

IMG-4019.jpg


Birchmount (sorry, no picture but looks like Ionview from what i saw.)

Ionview (nothing of interest...)
unnamed.jpg


Kennedy GO (Looks really good actually, no shots of the LRT station unfortunately)

IMG-4061.jpg

IMG-4060.jpg


Guideways and OCS poles and cables are fully finished. Sidewalks are fully finished, and nicely wide! Don Mills-DVP roadway is nicely and smooth paved. Overall, construction is fine, but surprisingly slower than what it should be. and sloane is looking to be the farthest advanced even though it was actually built last. I was in a bit of a rush so not all stops were taken pictures of perfectly but honestly there's not much of interest. They're all not where they should be and it's likely that everything on the surface section will actually be done by the end of the summer. But one can hope for it to be done before then.
 
Last edited:

Coolstar

Senior Member
Member Bio
Joined
Mar 22, 2019
Messages
1,245
Reaction score
2,465
Location
Toronto
Rail update.

So, surface section testing will begin later this Spring. Obviously trains from the EMSF can't get to the other side of the line since the central section of the line is still further behind. I wonder what methods they'll use to get the trains onto the tracks in the surface section.
 

EastYorkTTCFan

Senior Member
Member Bio
Joined
Jun 5, 2015
Messages
3,167
Reaction score
1,099
Location
East York
Kennedy is progressing remarkably well. I don't think the station will be operational this year BUT at least we will be back to normal on the surface this year.
I doubt it will be operational until December of 2022 with the way things are going with Eglington. Until Metrolinx show, there are tracks laid in Eglington West station (not using their sully name for it) and Eglinton and Younge I won't believe any opening date they give.
 

Steve X

Senior Member
Member Bio
Joined
Jan 16, 2016
Messages
2,086
Reaction score
1,507
So, surface section testing will begin later this Spring. Obviously trains from the EMSF can't get to the other side of the line since the central section of the line is still further behind. I wonder what methods they'll use to get the trains onto the tracks in the surface section.
If they can just install the tracks through the central section, they could just tow them there. It doesn’t make sense to load them on trucks.
 

drum118

Superstar
Member Bio
Joined
Apr 24, 2007
Messages
16,649
Reaction score
11,661
Location
Mississauga, where cars rule city growth
We had a quick look at the east end today as I couldn't get the shots I wanted.

Tower crane in the process of being remove so no shots from the overpass.

A number of area missing rail and most likely due to have cable install.

I will say off had 80% of the OS in place as well track. Lots of work taking place on the station and don't think any stations is 100% complete. 4 x 4 poles being place with orange on the top haft with the black T on it and the rest black.

The wrapping of the rail is odd with some material grey while the rest is black. Some have tape around the rail like TTC does while some have wire. Until I have a closer look and some shots, can't say what going one..

Any testing on the surface will be close to June or July or depending when cars can get to the open area. No cars will be shipped by truck to the east end to do testing as far as I know.

Curbs being reinstall where they used to be.
 

EastYorkTTCFan

Senior Member
Member Bio
Joined
Jun 5, 2015
Messages
3,167
Reaction score
1,099
Location
East York
If they can just install the tracks through the central section, they could just tow them there. It doesn’t make sense to load them on trucks.
Unfortunitly two of the sations are still pretty much open pits with nothing even close to having tracks laid in them as far as metrolinx has shown.
 

44 North

Senior Member
Member Bio
Joined
Feb 8, 2010
Messages
3,574
Reaction score
2,007
Location
Ward 28
If they can just install the tracks through the central section, they could just tow them there. It doesn’t make sense to load them on trucks.

To add onto this notion. I think having tracks completed at the outset could be a definite gamechanger for construction of lines like this. Have a couple stations near the periphery be depots, then freight materials for the stations using the tracks. Fewer trucks on the roads and better managed station sites.
 