That was never happening as Crosslinx only floated it publicly without Metrolinx agreeing to it. Metrolinx subsequently declared it to be unacceptable: https://www.cp24.com/news/crosslinx...n-crosstown-lrt-without-key-station-1.5129751I thought the last we heard in October 2020 was they'd open the full line except for Eglinton station in March 2022, and open the new platforms in May 2022, and the connections from Line 5 to Line 1 in September 2022.
When did it slip?