Toronto CAMH Queen Street | 60.3m | 7s | CAMH | Diamond Schmitt + KPMB + TreanorHL + HOK

Crane is fully installed.
20240605_180016.jpg
 
Are there two cranes on this site now? (No one has shot two together, but the earlier shots and the most recent shots appear to have different cranes in them, so either one was switched out for the other, or we have two.)

42
 
Are there two cranes on this site now? (No one has shot two together, but the earlier shots and the most recent shots appear to have different cranes in them, so either one was switched out for the other, or we have two.)

42
Two cranes on the Discovery Centre site, no cranes yet on the Secure Care and Recovery Building site.
 

Back