Toronto Parkside Square (Phase 4) | 109.25m | 34s | Tribute | Turner Fleischer

James1256

Active Member
Member Bio
Joined
Jan 2, 2023
Messages
422
Reaction score
3,721
It looks like an application was filed recently for increasing the height of the yet-to-be-built 35 floor building to 43 floors

As per the block context plan file:
Screenshot 2024-12-11 at 10.36.11 AM.png
 
This thread has been broken off from the Parkside Square Masterthread for discussion of Phase 4 (Building A) (AKA "Block 1 Part 2").
PLN - Architectural Plans - null - 2024-12-12T065320.572-07.jpg


Parkside Square Phase 4 includes Building A: a proposed 43-storey rental apartment building designed by Turner Fleischer for Tribute on the northeast corner of Yorkland Boulevard and Smooth Rose Court, west of Consumers Road and south of Sheppard Avenue East in Toronto's Henry Farm neighbourhood.
PLN - Renderings or Perspective Drawings - null (13)-1.jpg
PLN - Renderings or Perspective Drawings - null (13)-2.jpg
PLN - Renderings or Perspective Drawings - null (13)-3.jpg
PLN - Renderings or Perspective Drawings - null (13)-4.jpg
PLN - Renderings or Perspective Drawings - null (13)-5.jpg
 

SPA for Building A has been resubmitted again this time with stat changes:
  • Storey count decreased from 43 to 34
  • Height decreased from 135.05 to 109.25m
  • Total residential units decreased from 471 to 375
  • Total vehicular parking decreased from 314 to 281 (counts for Building A only, underground garage shared with Building B)
  • Total bicycle parking increased from 354 to 376
Updated rendering:
PLN - Architectural Plans - Segment 001 of Architectural DWGs_Full Set_BLD A_15 Smooth Rose Cr...jpg


No significant permit movement since the issuance of the shoring permit
 

Back
Top