Pickering Pickering City Centre (Block 1) | ?m | 55s | CentreCourt | Diamond Schmitt

Paclo

Administrator
Staff member
Member Bio
Joined
Aug 25, 2020
Messages
2,845
Reaction score
13,530
Pickering City Centre (Block 1): a proposed mixed-use condo & retail development of towers ranging from 40 to 55-storeys designed by Diamond Schmitt Architects for CentreCourt on the east side of Glenanna Road, north of Pickering Parkway in the northeast quadrant of the Pickering Town Centre lands.

For the master project page please see here, and thread here.

Context plan of Block 1:
Block1.jpg


Phasing Plan of Block 1:
Accessibility Advisory Committee Meeting  - June 21st 2023 1-23-32 screenshot.jpg


Renderings:
Aerial VF.jpg

pdiumVF.jpg

Centre Square vF.jpg

Jewel Box vF.jpg
 

Attachments

  • 221020_PICK_TC__VW04.jpg
    221020_PICK_TC__VW04.jpg
    253 KB · Views: 85
  • Picture1_edited.jpg
    Picture1_edited.jpg
    309.2 KB · Views: 71
  • Picture_edited.jpg
    Picture_edited.jpg
    744.9 KB · Views: 74
  • bar2-1.jpg
    bar2-1.jpg
    281.5 KB · Views: 66
  • Accessibility Advisory Committee Meeting  - June 21st 2023 1-27-23 screenshot.jpg
    Accessibility Advisory Committee Meeting - June 21st 2023 1-27-23 screenshot.jpg
    609.1 KB · Views: 65
  • Accessibility Advisory Committee Meeting  - June 21st 2023 1-27-17 screenshot.jpg
    Accessibility Advisory Committee Meeting - June 21st 2023 1-27-17 screenshot.jpg
    693.9 KB · Views: 73
  • Accessibility Advisory Committee Meeting  - June 21st 2023 1-27-13 screenshot.jpg
    Accessibility Advisory Committee Meeting - June 21st 2023 1-27-13 screenshot.jpg
    599.2 KB · Views: 65
  • 221020_PICK_TC__VW03.jpg
    221020_PICK_TC__VW03.jpg
    331 KB · Views: 71
 
Saw this from the durham transit executive.... Are we starting to see shovels in the ground for this soon?View attachment 568230
Yeah I know tower 1 is expected to start this summer (tower 2 may start as well too) but this detour is mainly for the relocation of the sewage/water drainage system to glenanna road, that’s currently under the parking lots at PCC. Once they’re moved, it will allow for tower 3 and 4 to proceed with construction once they go for sale, if my memory serves me right.
 
Saw this from the durham transit executive.... Are we starting to see shovels in the ground for this soon?View attachment 568230
Off topic but hopefully with all this development, the future plan includes a new bus terminal (similar to York mills Go/TTC bus terminal) at Pickering parkway. With a direct connection to the mall and go pedestrian bridge, where commuter don’t have to step a foot outside. It just makes sense. With office space above.
 
Last edited:
Off topic but hopefully with all this development, the future plan includes a new bus terminal (similar to York mills Go/TTC bus terminal) at Pickering parkway. With a direct connection to the mall and go pedestrian bridge, where commuter don’t have to step a foot outside. It just makes sense.
Ill have to dig, but it seems to me there was already talk of reconstructing Pickering parkway terminal....i don't think it was to be enclosed but I can't recall of the top of my head.
 

Back
Top