Toronto Edenbridge on the Kingsway | ?m | 9s | Tridel | Kirkor

interchange42

Administrator
Staff member
Member Bio
Joined
Apr 23, 2007
Messages
27,384
Reaction score
36,595
Location
by the Humber
It appears that phase one will be the condo in the southeast corner of the site, so, new thread for this.

The overall site thread is here.

42
 
Last edited:
So, just thought I'd follow up on my earlier question - is this a go?

I'm not all that familiar with the site phasing, but a Site Plan Approval application is certainly a step in the right direction. Waiting to see if any docs come in soon.
 
The application is a amendment to the Block 5 Site Plan to replace some of the ground floor retail with townhouse units:
upload_2018-6-30_10-18-43.png
 

Attachments

  • upload_2018-6-30_10-18-43.png
    upload_2018-6-30_10-18-43.png
    449.2 KB · Views: 3,585
The application is a amendment to the Block 5 Site Plan to replace some of the ground floor retail with townhouse units:
View attachment 148642

They're still tinkering around? The city approved the plan in 2014 after a long, bitter battle. You'd think they'd want to start ASAP. So sick of waiting for this to get going.
 
Well this is....uninspiring. You would think Tridel would know how to knock it out of the park on a more consistent basis, enough with the hit or miss stuff.
 
A jumbled, dated mess, but at least it has street fronting retail and brings urbanism to the area. Bring on phase 1 of Humbertown's makeover. They better have kept the Humberline for the subsequent phases...
 
It's safe but refined. All in all pretty solid considering it's coming from Kirkor. This location isn't screaming for signature - something like this is the correct response. There may be some details that need to be finessed, but it's a solid effort.
 
Slightly jumbled, but mostly a highly articulated building to break down its apparent bulk somewhat, and with colour, and brick framing around punched windows, and it even looks like curtain wall up top. For the staid Kingsway, this is pretty decent.

42
 
The Bulk Barn has closed and is being gutted. Demolition imminent.

A new LCBO will be opening next to the existing Loblaws in the main plaza in March 2020, allowing the current location to be razed.

Looks like a spring construction start for this phase, 9 years after it was first proposed...
 

Back
Top