I see why the tower crane is still in place as it was waiting for steel work and mechanical equipment to be place on the southside of the roof. Otherwise, it should been down weeks ago.
53622892475_dbebe9db23_b.jpg

53622651108_80fe4af5ef_b.jpg

53622651153_727804f16e_b.jpg

53621562607_4d9280d77b_b.jpg
 
April 25
The tower crane will be gone shortly now the mechanical has shown up for the roof and currently been installed
53680235319_525ddcf129_b.jpg

53680335475_95e1c75f68_b.jpg

53680098263_c4377d9937_b.jpg

53679013062_d4cdb00634_b.jpg
 