News   Apr 20, 2026
 46     0 
News   Apr 17, 2026
 832     0 
News   Apr 17, 2026
 1.9K     6 

Search results

  1. Milaisacat

    Hamilton 188 Cannon Street East | 106.6m | 33s | Vantage | Arcadis

    A simple wheel wash station would fix the issue, and they have plenty of room with the street closed. It hasn't been terrible, but mud and dirt on Cannon has been frequent.
  2. Milaisacat

    Finch West Line 6 LRT

    Agreed. It's infuriating to have operational policy dictated by the equivalent of an annoying university seminar debate over terminology that derails the whole class. LRT = Tram = Streetcar. Line design and operating plan is the whole ballgame. We don't have a different set of road rules for...
  3. Milaisacat

    VIA Rail

    We're definitely in "early 2026", so any day now VIA ought to be announcing the selected partner for the long-range fleet replacement. Surely? https://media.viarail.ca/en/press-releases/2025/rail-celebrates-70-years-canadian-and-looks-future-passenger-rail-canada
  4. Milaisacat

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    It is extraordinary that they have managed to make bollards a tripping hazard.
  5. Milaisacat

    Unwin Ave - Undriveable

    <gestures expansively around Hamilton>
  6. Milaisacat

    Hamilton Television City | 110.14m | 32s | Lamb Dev Corp | a—A

    That's a promising start for the cladding. Good to see.
  7. Milaisacat

    Hamilton The Design District 41 | ?m | 31s | Emblem Developments | Arcadis

    Great shots. The failure to bring that brick column down to grade is a hilarious design oversight that I will shake my head about for years to come. It's such a no-brainer that I have to assume it was an error that nobody caught, as opposed to an intentional design choice. Innsertnamehere, I...
  8. Milaisacat

    Hamilton 188 Cannon Street East | 106.6m | 33s | Vantage | Arcadis

    Notwithstanding debate around the merit of above-grade vs below-grade parking, if you are going to do above-grade parking, this is how you do it. Source
  9. Milaisacat

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    I think they need to hustle on the pole before it gets Part IV designation and we're stuck with it forever. A grim portent of things to come:
  10. Milaisacat

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    We'll be spoiled for room.
  11. Milaisacat

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Notwithstanding the accuracy of the measurement, it's worth taking a look at a reputable (if dated) decibel level chart for context of 80dB: Source: Yale Environmental Health and Safety
  12. Milaisacat

    VIA Rail

    Thanks very much, and that's a great link. This photo, chef's kiss...
  13. Milaisacat

    VIA Rail

    I've noticed at least two of the new Venture trainsets in the Mimico yard are shorter four-car consists (locomotive, two standard cars, and a cab car). Apologies if this has been discussed, but what is the purpose of these shorter trains?
  14. Milaisacat

    Ontario Northland/Northern Ontario Transportation

    Two generations of Northlander.
  15. Milaisacat

    Toronto Downsview West District | ?m | ?s | CLC

    This thread is for the Downsview West District. Taxiway West is a different district.
  16. Milaisacat

    Hamilton The Design District 41 | ?m | 31s | Emblem Developments | Arcadis

    "Available units range in price from $824,990 to $824,990." Doesn't anyone proofread anything these days? And of all things to overlook, the price range?
  17. Milaisacat

    Ontario Northland/Northern Ontario Transportation

    Ah. Well, they must have changed the track on which it is stored, because it's the first time I've seen it.
  18. Milaisacat

    Ontario Northland/Northern Ontario Transportation

    The first Northlander trainset is at the VIA Mimico yard. I couldn’t take a photo, but it looks great!
  19. Milaisacat

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    Now that they have opened the east side of the bollards (adjacent to the Union Station sign), I expect that they will now block off the west side and complete the installation of the bollards to the retaining wall. They couldn't have blocked off everything to do it all at once (though with the...

Back
Top