News   Dec 05, 2025
 685     2 
News   Dec 05, 2025
 2.2K     4 
News   Dec 05, 2025
 469     0 

Search results

  1. D

    Can I ask where to locate demolition permits ? I notice you post updated ones under review in forums

    Can I ask where to locate demolition permits ? I notice you post updated ones under review in forums
  2. D

    Hamilton 1620 Main Street East | 22.5m | 6s | CityHousing Hamilton | Edge Architects

    Too bad the City Motor Hotel Sign or a replica was not included here
  3. D

    Hamilton 537 King Street East | 30.5m | 8s | Lionheart | KNYMH

    Disappointing stabilization is not considered. The fires were at the rear of the property and the heritage aspect is at the front.
  4. D

    Toronto 2323 Yonge Street | 212.4m | 65s | RioCan | DIALOG

    was hoping to see a podium that incorporates more of the salvaged panels. Guess nothing is being incorporated from the existing building at this point ?
  5. D

    Toronto King-Bathurst Transit Oriented Community: South Site | 88.9m | 25s | Infrastructure ON | SvN

    Will 54-56 Stuart eventually be demolished or retained?
  6. D

    Toronto East Harbour | 214.2m | 65s | Cadillac Fairview | Adamson

    Nothing can be done to halt demolition or save the other two smaller structures at this point? I read there was a pending heritage review.
  7. D

    Brampton Bristol Place | ?m | 39s | Solmar | Graziani + Corazza

    Is the heritage home at 219 Main Street north still being retained? I saw it was for sale for $1 to have it relocated.
  8. D

    Toronto 328 Bloor West | 114.92m | 37s | First Capital | BDP Quadrangle

    Apparently there was a motion to evaluate 320-326 Bloor West for heritage value. Anyone hear any updates on this?
  9. D

    Toronto U of T: Schwartz Reisman Innovation Centre (Phase 1) | 64.8m | 13s | U of T | Weiss/Manfredi

    http://app.toronto.ca/tmmis/viewAgendaItemHistory.do?item=2020.TE18.16 Could see an attempt to designate 100 College when a rezoning application is submitted. I agree that it would be nice to see it restored.
  10. D

    Toronto 350 Bloor West | 117.65m | 36s | Andrin | Arcadis

    Unfortunately it’s a done deal to demolish the building at 334 Bloor West. Was also hoping it would be incorporated. I think they will be commemorating the building with a plaque
  11. D

    Toronto 350 Bloor West | 117.65m | 36s | Andrin | Arcadis

    Can anything be done at this point to save the corner facade?
  12. D

    Toronto East Harbour | 214.2m | 65s | Cadillac Fairview | Adamson

    https://www.toronto.ca/legdocs/mmis/2021/ph/bgrd/backgroundfile-173143.pdf This city document is from November and it states there are still ongoing discussions about the existing buildings and integrating the industrial heritage into the new development. I share similar feelings and think...
  13. D

    Toronto West House | 68.3m | 17s | Hines | 3XN

    Too bad they didn’t salvage those front doors
  14. D

    Toronto 2323 Yonge Street | 212.4m | 65s | RioCan | DIALOG

    How can we ensure the existing building at 2323 is incorporated into a new project?

Back
Top