we got our PDI at the end of January for a Feb. 2 occupancy. It was about a week before. At the time of the report, no toilets, fixtures, no island. the defects noted included grout and window issues, as well as a scratch on the cooktop.
Most were addressed before occupancy. The stovetop is...