News   Apr 26, 2024
 538     2 
News   Apr 26, 2024
 210     0 
News   Apr 26, 2024
 695     0 

Search results

  1. MrGoose

    The Coming Disruption of Transport

    It seems like this is a case where hydrogen would be a stronger energy candidate source than batteries. And given that these are industrial equipment, with fairly long life times they’ll probably stay fossil powered for a long time. They make up a comparatively small source of emissions so it’s...
  2. MrGoose

    The Coming Disruption of Transport

    If you really want personal freedom when travelling, a car (which costs thousands, a VIN attached to your name, a license attached to your name, insurance attached to your name) is not the way to do it. Bikes, scooters, skateboards bypass all of that. Bikes are the most liberating form of...
  3. MrGoose

    The Coming Disruption of Transport

    You're replacing ICEV maintenance with EV maintenance. Even though the components are simplified with respect to moving parts, you now have high-voltage involved. EV maintanance regime would be less repairs that cost more and are way more dangerous because of the electrical syste, This is not...
  4. MrGoose

    The Coming Disruption of Transport

    If your hybrid is not a plugin hybrid, then you don’t have to charge it, the battery is charged by the IC engine
  5. MrGoose

    The Coming Disruption of Transport

    I don’t understand this because I drive a hybrid Toyota. I get 1000km a tank and I gas up once a month and it costs me only 61$cad for a full tank. I live in an apartment so I can’t charge at home, so evs are out of the equation for me. Previous gen Priuses are common enough that maintenance...
  6. MrGoose

    Sheppard Line 4 Subway Extension (Proposed)

    What would be the extra cost of extending the Sheppard subway from McCowan to Malvern Town Center with a stop at Sheppard and Markham Rd
  7. MrGoose

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Get rid of those intersections for carsaltogether. Anyone would would use the Swift/Credit Union intersection can simply drive 400m to the Sloane intersection Altogether, these 5 left turns are totally unnecessary. Maybe you can have pedestrian crossings but theres no reason why we...
  8. MrGoose

    Toronto Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    Robert Bruce Ford Memorial Station Doug Ford Senior Memorial Station Royal Mattamy Station Deco Logos and Tags Station Richview Station Nashville Developments Martin Grove Station Renforth Pearson International Airport Gateway Station
  9. MrGoose

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    There are 5 places where a side street intersection with Eglinton has a left turn intersecting with the LRT. We can remove these left turns in favor of protected left turns at the nearest arterial-arterial intersection and halve the amount of traffic conflict points Swift / Credit Union Dr...
  10. MrGoose

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    Eglinton can still be grade separated. If you shut the eastern section down, the ROW to build an elevated line exists so long as you remove a couple of left turns.
  11. MrGoose

    Zoning Reform Ideas

    By restricting multi-family homes to arterials, this is the housing reality you will create, the mature state of which can be seen in North York Center. You can see this further reflected in the school district boundaries where the Noble Elites of East Willowdale elected to keep the low-born...
  12. MrGoose

    Zoning Reform Ideas

    Only noble born SFH owners are allowed quiet homes on low traffic, forested side-streets. Peasants get to overlook the stroad canyon and breath in tire dust and exhaust fumes, admiring the world from their 10sqft balcony. (Only a semi-serious take)
  13. MrGoose

    Zoning Reform Ideas

    Dougie's YIMBY phase could only last so long I guess
  14. MrGoose

    Toronto Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    But since the eastern part of the line is not grade separated, you still need operators, so you couldn’t have full train automation and you are still subject to the whims of bad drivers who might affect the operations out east.
  15. MrGoose

    Toronto Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    You’re gonna be spending a ton of money on the retrofits to the eastern leg and suffering through delays, when some guy in an SUV runs into Don Mills station or was drunk driving and takes out a catenary pole. And you’ll be spending tons of money trying to up the capacity when ridership...
  16. MrGoose

    Toronto Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    So what your saying is that if we had just switched out the train stock, and done anything else to the signal, station sizes, headway etc, we would’ve gotten a 22% boost in capacity? That’s a lot of ridership left on the table.
  17. MrGoose

    Toronto Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    We didn't save much if any money. If anything, we spent more money to get less. 1. The tunnels are the same diameter 2. The stations are about the same size or larger than they would have had to be to accomodate a subway with similar / more ridership (because of the lower capacity of low floor...
  18. MrGoose

    Planned Sprawl in the GTA

    Yea cars are dangerous but what will make them safer is when crashes automatically mean killing everyone aboard! Platform doors, Not a problem privatization will solve by itself. Not a problem privatization will solve by itself. Not a problem privatization will solve by itself Not a problem...
  19. MrGoose

    Planned Sprawl in the GTA

    Blaming it on "peoples distrust of the government" is excusing the producers and consumers of the misinformation too easily. Its a combination of car brain, multi-level misrepresentation of true stories, and generalized right-wing paranoia. The producers are either regurgitating 2nd, 3rd...
  20. MrGoose

    Toronto Ontario Line 3 | ?m | ?s

    I guess if ice falling onto the DVP is a problem, and the span is only 600m or so, and there is no need to have a single span, it doesn't make sense to put in a cable stayed bridge for any reason other than aesthetics. And similar pre-stressed concrete beam bridges have been built before, with...

Back
Top