News   Dec 23, 2025
 831     3 
News   Dec 23, 2025
 2K     1 
News   Dec 23, 2025
 2.9K     1 

Search results

  1. YDS

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Couple of evening shots from the Leaside bridge.
  2. YDS

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Another shot of crane from rainy Thursday. And on the north slope of the valley leading up to the Overlea Millwood intersection (sorry for the bad angle).
  3. YDS

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Couple shots into DonValley from Leaside bridge today.
  4. YDS

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Early morning walk today (Saturday) with the dog in Seton park. Crew already at work pre-7am doing some concrete pouring for the bridge pillar.
  5. YDS

    Toronto 50-90 Eglinton Avenue West | 169.03m | 49s | Madison Group | Audax

    And now the building next door.
  6. YDS

    Toronto 50-90 Eglinton Avenue West | 169.03m | 49s | Madison Group | Audax

    Demolition of the old Toronto Hydro building has begun. Photo from earlier this week.
  7. YDS

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Winter views of the both sides of the Don Valley portal
  8. YDS

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Progression of clearing for the Don Valley portal over the last year.
  9. YDS

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Yup. I ride by daily. Will try to keep documenting progress.
  10. YDS

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    In the Don Valley at the future portal.
  11. YDS

    Toronto Ontario Line 3 | ?m | ?s | Metrolinx

    Clearing in the valley for the bridge crossing progresses.
  12. YDS

    Toronto Uovo Boutique Residences | 42.8m | 12s | The Sher Corporation | RAW Design

    From this angle, it looks like someone's level was out of tune - either the wall guy or the floor guy! But I think artyboy's photos above explain it.
  13. YDS

    Toronto The Davisville | 42.08m | 12s | Rockport Group | RAW Design

    Quick shot from the pedestrian bridge on my way into work this morning. Looks like it's getting close to first floor pour.
  14. YDS

    Toronto Eglinton Line 5: Eglinton Station | ?m | 1s | Metrolinx | Arcadis

    Eglinton East at Yonge getting closer to paving.
  15. YDS

    Toronto Eaton Centre (Ongoing Renewal) | ?m | ?s | Cadillac Fairview | Zeidler

    Check out the last paragraph (and sentence) of this article from the past. https://torontoist.com/2014/01/from-eatons-to-sears-to-nordstrom/
  16. YDS

    Toronto Platform Condos | 31.09m | 9s | Sierra | Kirkor

    Looks like I was right. Seen in window of moneymart at monarch park just down the street.
  17. YDS

    Toronto Platform Condos | 31.09m | 9s | Sierra | Kirkor

    Perhaps a replacement for the one at Monarch park that will eventually become Greenwood subway second exit/entrance?? Maybe a bit early for that.

Back
Top