    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    Week it been some time since I wrote on here, I was moving phase 1 but I have had a drastically change with my Heath I had stroke, I and I never looked back. I live in Calgary in the SE bought I house.....I was going to have a party in 1401 but thing have charged. Also keep on him (R. Fallus)...
  2. R

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    have a look here http://www.tarion.com/Pages/default.aspx and get a lawyer to help you to understand your rights and the builders rights
  3. R

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    Thanks for the info.... I would like to know what the drama is LOL They are moving at a decent pace but I have talked to my lawyer and anything after Decembre will cost the developer mulla! I have recieved 2 notices already pushing back the date....
  4. R

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    Thanks for the comment about my pics...... It's very hard to see but they have pourd 75% of the floor for the 6th floor and have started on the 7th floor at the North end of the structure. They are still going at a good pace, and have lost a few days in April due to rain but its looking good...
  5. R

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    Here is a picture that shows the progression to date.
  6. R

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    Here is a pic of the phase 2 area, you can see the crane pad.
  7. R

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    I recall that Electric City was open to the public to purchase after July 2008. I bought prior to public release and I am coverd (September 2008)
  8. R

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    Good news for P2 purchasers...they are digging and preparing the pad for the tower craine, meaning that I can see them starting the foundations soon.
  9. R

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    I will take a pic every couple of weeks just to show the progress....but I do hope that Sept. will be the start of move-ins for everyone in the bottom floors :)
  10. R

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    Thats about right its bettween 1 week to 1 and 1/2 per floor and they are on the 3rd floor.
  11. R

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    What you are seeing is the underground parking and to why they have not built on top of it is becuase that will be the drive way between the buildings. They have completed the main floor where some units will be and where the rec room and basketball cort will be, and they have fully completed...
  12. R

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    Here is the pic I promise a little late but here it is.....as you can see they are just pouring the slab for the third floor......so I am thinking its going to be a week and half to do each floor (Main - eight) and a shorter time after that due to the smaller area of the floors.
  13. R

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    When did you buy? I was looking over my agreement today and under section 11.01 c I cannot do an assignement, but I bought in 2008..... My rate is 4.1.....and I signed that 2 years ago....I know I can get a lower rate and I am pushing RBC now....I heard that its better to do 90 days prior to...
  14. R

    Upside Down + Fuse Condos (Channington/Brownstone, 14s x2, 26s x2, Burka)

    The picture does not do it justice...from the ground level you can see the difference in height.....but thanks for the compliment. Also for the guy who wants to sell. As I understand it there is no assignment (sale), this I confirmed today with the sales office. I had called the sales...
  15. R

    Toronto Fuse & Fuse2 Condos | 80.16m | 27s | Neudorfer | Barrett

    They have been insulating the exterior and panting it......it looks better, but it is still a rat hole. I do hope when the new buildings are up the Coffee Time will also be transformed into something else......a Tim Hortons or a nice coffee shop....