News   Sep 13, 2024
 1.6K     0 
News   Sep 13, 2024
 2.4K     2 
News   Sep 13, 2024
 655     0 

Search results

  1. C

    Toronto Q Loft | ?m | 8s | Royal Queen | TACT Architecture

    We ran into a buried channel during a geotechnical investigation of 85 Hanna a few years ago so it's entirely possible.
  2. C

    Toronto Aura at College Park | 271.87m | 78s | Canderel | Graziani + Corazza

    It's part of the shoring system, either soldier pile (the steel part) and lagging (wooden slats) or an interlocking caisson (concrete) wall. Generally soldier pile and lagging is considered flexible while interlocking caisson walls are considered rigid. Rigid shoring would be used where...

Back
Top