March 19, 2022
- Pool columns have been poured
- Service connections for water and sanitary has begun on the southside of the building on Bremner Blvd (section of roadway will be closed until March 28th I believe)
I'm a longtime lurker of UT but usually on the Transportation and Infrastructure subforums. However seeing that there is not a lot of top down shots of this project posted. I decided to contribute when possible.
I found out about this forum early this year and I must say it's pretty satisfying to see all the finished work that the workers (myself included) have achieved throughout this project.
Thanks everyone for the update posts.