News   Dec 23, 2025
 457     3 
News   Dec 23, 2025
 1.1K     1 
News   Dec 23, 2025
 1.8K     0 

Search results

  1. N

    nw87 photos

    Hello all, I will be posting some other shots in here over time. Pinnacle One Yonge back in 2018 near the end of excavation.
  2. N

    Toronto 701 Evans Avenue | ?m | ?s

    Demolition of the existing structure is underway.
  3. N

    Forks Road Bridge Replacement

    Early on while the supports were being formed. The old lift bridge carrying Gio rail over the old pre bypass section of the Welland Canal. Shore ramps being constructed. Beams set, work shutdown till March for concrete deck construction.
  4. N

    Welland - 65 Canal Bank St

    Article here with information This is the former home of Union Carbide in Welland. This site will be developed in the future but in the meantime some 500,000 tons of synthetic graphite have been located and will be extracted for use in the electric car market. The Adjacent Lakeside Steel plant...
  5. N

    Mississauga Avonhead Industrial Campus | 14.29m | 1s | Carttera | Baldassarra

    557 & 587 Avonhead Road. Phase I — 362,000 SF with occupancy Q4 2023 Phase II — 378,000 SF with occupancy Q4 2024 https://avonheadcampus.com/

Back
Top