News   Jun 18, 2021
 1K     0 
News   Jun 18, 2021
 382     0 
News   Jun 18, 2021
 1K     2 

Search results

  1. achender

    Toronto | Riverside Square | 69.19m | 20s | Streetcar | RAW Design

    Seems a crane will be arriving soon. From yesterday.
  2. achender

    Ontario Line (was Relief Line South, in Design)

    Or deck, or irrigation, or basement renos. First world problems for sure.
  3. achender

    Ontario Line (was Relief Line South, in Design)

    Will do. I sent an enquiry to the email address included in the notification asking why my property was included given its distance from the current corridor. Asking if it was conceivable that the new corridor was going to be 130m wider than the existing one. I suppose they could be considering...
  4. achender

    Ontario Line (was Relief Line South, in Design)

    I just got a notification from Metrolinx that my house is within 30m of a new transit corridor (Ontario Line) and that they would be putting a note on my legal title to that effect. They must be defining the new corridor width pretty generously because I am about 160m from the current corridor...
  5. achender

    Toronto | T3 Bayside | 42m | 10s | Hines | 3XN

    Some work still going on in the pit.
  6. achender

    Toronto | Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    Seems to be in position, more or less.
  7. achender

    Toronto | Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    A couple more shots testing the limits of my Pixel 4 zoom. Sadly most of us will be seeing this from a distance for a couple years, I guess.
  8. achender

    Toronto | Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    Missed it by 30 minutes.
  9. achender

    Toronto | Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    This second link seems to provide a more up-to-date location. You will note that the information above is from "1d, 1h ago" The link below is only 5 hours old and has the location just off of Glace Bay. https://www.marinetraffic.com/en/ais/home/shipid:466637
  10. achender

    Toronto | Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    Maybe a bit complicated to get through the Canso Canal lock? A longish barge requiring tugs at either end to manoeuvre into the lock. https://en.wikipedia.org/wiki/Canso_Canal
  11. achender

    Toronto | Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    Seems like the Lois M. is the tug pulling the bridge barge to Toronto. It left the Cherubini Metal Works yard area in Halifax at about 15:30 today and is currently expected in Toronto on Sunday at 08:00. Not sure how accurate that estimate is. It's the same tug (Lois M) that brought the Cherry...
  12. achender

    Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    Cool looking trees. Are they some kind of deciduous fir? Dawn Redwood? They have some of those in Harbourfront Square.
  13. achender

    Toronto | Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    Ah. I didn't know that project went this far west. Thanks! Anyway, it's smack dab in the middle of the new alignment of Cherry leading to the new bridge from the Cherry/Lake Shore/Gardiner nexus. So they need to finish it before that can open.
  14. achender

    Toronto | Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    A few from today. The river valley from Cherry St. The ramp up to the future south Cherry St. Bridge. Some sort of tunneling launch shaft? Up by Cherry St. and the Gardiner. Maybe some tunnel wall segments by the old fire hall on Commissioners.
  15. achender

    Toronto | CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    A couple more from ground level today.
  16. achender

    Toronto | 86 John Street | 42.97m | 10s | Tawse | Sweeny &Co

    Hmm, looks like a temporary structure. Like a sales office or maybe even a patio.

Top