News   Dec 11, 2025
 540     0 
News   Dec 11, 2025
 212     0 
News   Dec 11, 2025
 966     1 

Search results

  1. drum118

    Dundas West/ Bloor Mobility Hub +interconnected hub network (Metrolinx)

    As of Nov 27, the area was dead as a door nail. Love the old posted notices for the Railpath as the sign said the the Railpath would be close in 2022 and reopen in 2023 considering we are at 2025 with it still close. Maybe the new entrace will be open to the station by 2027 as it still has a...
  2. drum118

    TTC: Other Items (catch all)

    Dundas and Eglinton West Stations to be officially renamed as of December 7 Dec. 2, 2025 Starting on Sun., Dec. 7, the TTC will officially rename two stations on Line 1 Yonge–University. Eglinton West Station will become Cedarvale Station, and Dundas Station will be renamed TMU Station. These...
  3. drum118

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    Nov 23-30 Long Time has been tight the past 10 days as well this coming week that caused me to have a backlog for the corridor as well posting. Been able to find some time to do some shooting with me having seem the full corridor from end to end this weekend as very sections this past week...
  4. drum118

    GTHA Transit Fare Integration

    Ontario extending One Fare transit program for 2 more years
  5. drum118

    TTC: Other Items (catch all)

    Ontario extending One Fare transit program for 2 more years
  6. drum118

    TTC Subway Station Construction/Modernization

    Nov 27 They have moved something on the west end that allows you to view the new terminal as it comes out of the ground. Galazing is being installed for the new entrance. They have closed the west sidewalk in the area and are forcing pedestrians to use the east sidewalk.
  7. drum118

    VIA Rail

    yes
  8. drum118

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Doug Ford has had it with Eglinton Crosstown construction
  9. drum118

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    All kinds of hydro and telecommunication had to be removed first before new utility work could start. Now that those items have been removed, construction has begun on the sewer, water lines, and other utilities to widen the south-east corner. The southwest corner still has to be done. Then you...
  10. drum118

    Mississauga M3 at M City | 260.29m | 77s | Rogers Real Estate | Arcadis

    Nov 29 They are enclosing the damper area Nov 22 Shot from Islington Ave overpass
  11. drum118

    VIA Rail

    Nov 22 More up on my site They have built another building next to the new Siemens SCV-42 locomotive Trainsets building. They still don't have all the tracks in place for both new buildings. There were 5 Siemens SCV-42 locomotive trainsets in the yard.
  12. drum118

    Toronto Pinnacle One Yonge | 351.85m | 106s | Pinnacle | Hariri Pontarini

    Nov 22 Shot from Islington Overpass Shot from Brown's Line
  13. drum118

    Mississauga Dixie Rd/QEW New Interchange (MTO, 1s, AECOM)

    Nov 27 No shifting of the eastbound lanes yet as they were paving at the far east end today. Saw no striping for the ramps.
  14. drum118

    TTC: Other Items (catch all)

    November 27, 2025 OVIN and the TTC to Pilot New Made-in-Ontario Transit Technologies The Ontario Vehicle Innovation Network (OVIN) is partnering with the Toronto Transit Commission (TTC) to pilot innovative transit solutions that could improve safety, reliability, and customer experience. As...
  15. drum118

    miWay Transit

    It will be interesting to see where they want the land for the BRT but behind close doors at this time.. The Four Corners area is not to be part of this request as it will be up to developers when they redevelop the site even if it means 2046+ and a pinch point of one lane of traffic each way...
  16. drum118

    GO Transit: Construction Projects (Metrolinx, various)

    Nov 22 More up on my site No idea which bridge will be remove first over the Etobicoke Creek Dec 6-7. It could be the Track 3 girder bridge or the double track deck truss bridge It was stated that it is possible that when the deck truss bridge is remove that 4 girder bridges could be install...
  17. drum118

    GO Transit: Construction Projects (Metrolinx, various)

    Nov 22 Long Branch GO Station with a lot more up on my site By the looks, the new east tunnel is ready to be move during the line closure on Dec 6-7

Back
Top