News   Dec 05, 2025
 824     3 
News   Dec 05, 2025
 2.5K     4 
News   Dec 05, 2025
 505     0 

Search results

  1. DSCToronto

    Cycling infrastructure (Separated bike lanes)

    Quel surpris! Up to now, this has been SUCH a well managed Project...
  2. DSCToronto

    University Avenue (History and Future Redesign)

    Walter: Your posts are starting to become annoying, again. This is the kind of post that would better fit in Then and Now thread or even here IF anyone was suggesting this!
  3. DSCToronto

    Toronto 66 Third Street Shelter | 20.5m | 4s | City of Toronto | Montgomery Sisam

    This fits here SEE: https://secure.toronto.ca/council/agenda-item.do?item=2025.PH26.10 It is worth reading the communications from two local resident groups who seem determined to keep fighting this shelter being built - this time because they say that the partial closure of a Lane ought to...
  4. DSCToronto

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    The delays on Line 5 are nothing to do with the City - they are all on Metrolinx and their (usually micro-managing) boss Doug Ford.
  5. DSCToronto

    University Avenue (History and Future Redesign)

    This probably belongs here...
  6. DSCToronto

    Spaces (former WE Charity HQs, 345 Queen St E, TriAxis, 3s, Kohn Partnership)

    That is a very extreme view - libraries work best if they have fairly large (and open or flexible) floor-plates and if you put a library below any other use you need to use some of the space for elevators and for stairs and a large residential building needs space on ground floor for garbage...
  7. DSCToronto

    Toronto Pinnacle Lakeside (Phase 1) | 174.86m | 54s | Pinnacle | Hariri Pontarini

    Maybe, but the City wants to get that block of Lower Sherbourne back to two-way traffic so I suspect it will be done - sooner than later.
  8. DSCToronto

    Spaces (former WE Charity HQs, 345 Queen St E, TriAxis, 3s, Kohn Partnership)

    Yes, the current St Lawrence branch is below a residential building and gets frequent floods.
  9. DSCToronto

    Toronto Sugar Wharf Condominiums (Phase 2) | 283.6m | 85s | Menkes | a—A

    I looked it up and here is the Transportation Master Plan From: https://www.waterfrontoronto.ca/sites/default/files/connect/waterfront/e175e435-b3a0-4ff2-be24-1eb449a16b31/lower-yonge-precinct---pic-summary-report-final-low-res.pdf
  10. DSCToronto

    Toronto Sugar Wharf Condominiums (Phase 2) | 283.6m | 85s | Menkes | a—A

    Yes, the Bay on ramp is being removed and the Jarvis off ramp will end at Yonge. Or that used to be the plan.
  11. DSCToronto

    St Lawrence Market

    This urgent motion was passed by TEYCC in July 2025 because the tend was due to be demolished later this year' '. Naturally, it's still there, though it is still only December so I suppose.......
  12. DSCToronto

    TTC: Other Items (catch all)

    The TTC Presser states "In May 2025, the TTC Board approved the renaming of Dundas Station to TMU Station, reflecting a new partnership with Toronto Metropolitan University (TMU). Beyond the name change, this partnership includes the creation of the Transit Innovation Yard, a dedicated hub for...
  13. DSCToronto

    Spaces (former WE Charity HQs, 345 Queen St E, TriAxis, 3s, Kohn Partnership)

    It is clear from this press release that TPL include to CLOSE the current St Lawrence Branch when this one opens. I hope they can be persuaded to continue to have a branch somewhere south of QUEEN STREET between Yonge and Parliament as this area will be very 'under-libraried'.
  14. DSCToronto

    Toronto Bike Share

    Yes, most certainly DO work but one (Lower Sherbourne just south of The Esplanade) has been out of service for many months. I see no way to report it. The map does not note any being disabled. Though I would like them to deal with broken docks, the REAL problem is that there are far too often...
  15. DSCToronto

    Toronto Basin Media Hub | 21m | 5s | Hackman Capital Partners | SOM

    Not quite sure what this means but ... SEE: https://secure.toronto.ca/council/agenda-item.do?item=2025.EX28.7
  16. DSCToronto

    Toronto Bike Share

    I walked past 4 or 5 Bike Docks in St Lawrence yesterday afternoon. I saw THREE empty docking 'ports' and I know at least one of them has been defective for months. They REALLY need to take some more bikes off the street or buy more docks!!
  17. DSCToronto

    Toronto Pinnacle Lakeside (Phase 1) | 174.86m | 54s | Pinnacle | Hariri Pontarini

    Maybe not this fall but it IS being widened/straightened. The work on Lower Sherbourne may be a City-run project though paid for by the developer. They have quite a bit of preparation to do first including relocating Hydro poles on west side of the street and moving the fire hydrant on QQE...
  18. DSCToronto

    St Lawrence Market

    The white fabric is clearly the winter protection and is covering the scaffolding (and why the scaffold was raised above the roof- line) I assume they will heat the work area and are now working on brickwork and maybe windows. Clearly they are not done yet,! Here is ashot of the FlatIron...
  19. DSCToronto

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    My City contacts tell me... "The Great Hall projects (lighting and marble floors) are advancing and on track for project work to commence next year. The Flux art installation remains on scheduled to be installed and completed in February 2026, following the wrap-up of the Roller Express event...
  20. DSCToronto

    Toronto Bike Share

    There is always room for expansion but BikeShare has really expanded amazingly fast in last year or two.

Back
Top