News   Dec 05, 2025
 1K     5 
News   Dec 05, 2025
 3.1K     7 
News   Dec 05, 2025
 601     0 

Search results

  1. H

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    In 30 years it will be obsolete and scrapped like the SRT.
  2. H

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    Lest forget the idiots who drive onto the tracks, collide with trains and press the emergency stops for no/trivial reasons...
  3. H

    GO Transit: Construction Projects (Metrolinx, various)

    Any TOD planned for this area?
  4. H

    GO Transit: Construction Projects (Metrolinx, various)

    Some work is being done on the Stouffville Line at the level crossings at Unionville Main Street and McCowan. Workers are removing vegetation around these crossings. Any idea what is happening?
  5. H

    GO Transit: Construction Projects (Metrolinx, various)

    https://www.blogto.com/city/2023/11/pickering-union-station-toronto/
  6. H

    Markham Markville Mall Redevelopment | 138m | 45s | Cadillac Fairview | Urban Strategies

    Yes, and the lawn sign groups are opposing the whole Secondary Plan, not just the CF project. So their number is not far off. I am not sure why the other post said it is.
  7. H

    Markham Markville Mall Redevelopment | 138m | 45s | Cadillac Fairview | Urban Strategies

    The opposing parties said the City gave the 40 - 50K new resident number in the 2nd public meeting, after being specifically asked. Now that number is not correct? If yes what is the correct number and the source?
  8. H

    Markham Markville Mall Redevelopment | 138m | 45s | Cadillac Fairview | Urban Strategies

    But Metrolinx better grade separate McCowan and Kennedy, and YRT really needs to beef up services especially inside subdivisions, if they are serious about getting people to take transit. Congestion is already a nightmare now along these corridors...
  9. H

    Markham Markville Mall Redevelopment | 138m | 45s | Cadillac Fairview | Urban Strategies

    Yes, but that is part of the game process.
  10. H

    GO Transit: Construction Projects (Metrolinx, various)

    This is coming too. I don't know how Centennial GO Station can handle all this additional demand... https://urbantoronto.ca/database/projects/markville-mall-redevelopment.51306
  11. H

    GO Transit: Construction Projects (Metrolinx, various)

    Electrification being the core of Go Expansion, a reflection how seriously they take these things...
  12. H

    GO Transit: Construction Projects (Metrolinx, various)

    Interesting they are still showing diesel trains in the renderings...
  13. H

    VIA Rail

    This HFR is a joke really. Why are we even talking about this?
  14. H

    Toronto Eglinton Line 5 Crosstown West Extension | ?m | ?s | Metrolinx

    Any chance the west extension opens before the original stretch?
  15. H

    Markham Markville Mall Redevelopment | 138m | 45s | Cadillac Fairview | Urban Strategies

    No considerations were given to congested roads, absence of public transit, long lines at ER and family doctors (or the lack of), employment opportunities within the community and crowded classrooms....
  16. H

    GO Transit Electrification | Metrolinx

    They need two years to do this?
  17. H

    Toronto Eglinton Line 5 | ?m | ?s | Metrolinx | Arcadis

    they call can so what's the point of changing anyways

Back
Top