News   Dec 05, 2025
 262     0 
News   Dec 05, 2025
 441     1 
News   Dec 04, 2025
 1K     1 

Search results

  1. N

    Toronto Bike Share

    Remember, you're running for Councillor against him next year, you really should be talking to potential campaign managers and fundraisers about now; and making sure you save up some vacation days for campaigning!
  2. N

    GTHA Transit Fare Integration

    I'm not sure what you're asking. The existing program did result in a fare rebate if you use both the TTC and GO, but renewing it doesn't change anything. There were several different augmentations under discussion, none of which are going forward right now.
  3. N

    GTHA Transit Fare Integration

    Further note, I have now confirmed that the renewal is for 2 years, so no improvements are likely til March 2028.
  4. N

    Mayor Olivia Chow's Toronto

    Please do not post links to the same report in multiple threads without a compelling reason. You've also posted this is the cycling thread. It contains no information that I have not already posted, and the headline is misleading, but I digress.
  5. N

    Toronto Seaton House Redevelopment | 58m | 10s | City of Toronto | B+H

    Unfortunately, @ADRM has not had this project spiked yet...,....and its heading towards construction as a colossal and overly expensive, under-achieving flop. https://www.toronto.ca/legdocs/mmis/2025/gg/bgrd/backgroundfile-260425.pdf
  6. N

    TTC: Easier Access Phase III

    Expropriation being advanced as an option to implement the second exit for Summerhill Station: https://www.toronto.ca/legdocs/mmis/2025/gg/bgrd/backgroundfile-260348.pdf
  7. N

    Toronto Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    This tender is for @DSCToronto https://www.toronto.ca/legdocs/mmis/2025/gg/bgrd/backgroundfile-260549.pdf Restored Great Hall floors with heritage-compliant Marble.
  8. N

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    A tender for urgent repairs to the dilapidated bents from Bay to Yonge is the subject of a report to Government Management Ctte. https://www.toronto.ca/legdocs/mmis/2025/gg/bgrd/backgroundfile-260548.pdf
  9. N

    Toronto Coach Terminal Redevelopment | 147.7m | 44s | Kilmer + Tricon | Studio Gang + a—A

    Speaking of the 'bus bays' which in a form, are staying as the new paramedic/EMS facility...... We have contract news: https://www.toronto.ca/legdocs/mmis/2025/gg/bgrd/backgroundfile-260453.pdf From the above: More at the link above....
  10. N

    GTHA Transit Fare Integration

    As I said it would, some months back: https://urbantoronto.ca/forum/threads/gtha-transit-fare-integration.20248/post-2256535 Unfortunate that none of the enhancements they were looking at are moving forward at this point, that means they will likely be deferred to at least 2027. But not...
  11. N

    Parks - new & revitalized

    @DSCToronto this stage of the process/report is new, but the idea is not. We discussed it previously in the Humber Gap Trail since the two plans overlap. https://urbantoronto.ca/forum/threads/mid-humber-gap-trail-study-city-of-toronto.32411/page-3#post-2162389
  12. N

    Downtown Grocery Store List (current + proposed)

    I'm up that early, but posting on UT and doing the NYT Crosword, and catching up on email, and having my very needed coffee. Out the door is more 10'ish. Farm Boy certainly isn't 'cheap' but its not luxury pricing either. As with any chain, it depends on what you're looking for... For FB...
  13. N

    Toronto Bike Share

    I agree w/all of the above. But would add that some of the areas I noted are rather conspicuous and seemingly arbitrary holes in the network coverage. Equally, some areas like East York which are close to the core and have high potential seem to have very little added depth.
  14. N

    Toronto Bike Share

    None that I'm aware of.......
  15. N

    Toronto Bike Share

    Lets see if I can enlarge the Bikeshare Future Stations a bit: A couple of sections stand out for relative lack of proposed installations: Next to nothing for Wexford and eastern portions of North York between Eglinton and 401. Etobicoke mostly ignored: Nothing new along Queensway in...
  16. N

    Downtown Grocery Store List (current + proposed)

    In the course of my Lakeside walk ....where I did not encounter @GameOnBrad even once....... I also checked out the Farm Boy in Sugar Wharf again....... Based on the traffic I observed on a Saturday afternoon this store must be awash in red ink. They're part of Empire who can underwrite...
  17. N

    Downtown Grocery Store List (current + proposed)

    Popped in to the new Marche Leos today; more staff than customers......dead quiet. I don't want to think about how many perishibles will be binned this week. **** On the store itself, its not quite done. The pharmacy section is still under construction, and Prepared Foods is not fully...
  18. N

    Cycling infrastructure (Separated bike lanes)

    LOL, I could say the same to you, I had the renders in my post, when your post went live. I deleted them.
  19. N

    Cycling infrastructure (Separated bike lanes)

    Trails Plans (coneptual) from 2016 for Management Area 1 (south of Steeles) :
  20. N

    Toronto 405 Sherbourne | 120.1m | 35s | TCHC | Alison Brooks

    Lets consult the Arch Drawings: Across the top: Side Panel: No Planning Letter; but abbreviated version within Cover Letter. CL refers to both firms without distinguishing roles. **** I will say, the design language reads more Brooks to me; but a_A have been known to surprise from...

Back
Top