  1. P

    Toronto St Regis Toronto Hotel and Residences | 281.93m | 58s | JFC Capital | Zeidler

    Is this going to be concrete or steel? There may be no parking underground, however there is still going to be a pretty big hole, I would guess the foundations on such a tall building to require a certain depth. Paul
  2. P

    Bay Adelaide Centre West Tower (Brookfield, 50s, WZMH)

    ^^ Nice pics, so they were pouring the core today, s possibly on Monday we will see it go up? I wonder how long concrete takes to set well enough before a structure such as the forms can be moved up. Paul
  3. P

    Bay Adelaide Centre West Tower (Brookfield, 50s, WZMH)

    Little update: 400 ton crane, wow!! And some more steel..... Paul
  4. P

    Bay Adelaide Centre West Tower (Brookfield, 50s, WZMH)

    They were putting steel on the Bay side tonight, just wished I had my camera, those trucks hauling the steel are fricking huge. Paul
  5. P

    Bay Adelaide Centre West Tower (Brookfield, 50s, WZMH)

    ^^ I was thinking that too. The steel, once it start to rise will be going really quick. But the concrete at RBC takes a lot of time between each cycle. I wonder what the height difference is right now between the two projects? Paul
  6. P

    Bay Adelaide Centre West Tower (Brookfield, 50s, WZMH)

    What I really like about this steel is it gives you a great idea about proportions of the building. We can start to get a feel for the foot-print this tower is going to have. Paul
  7. P

    Toronto St Regis Toronto Hotel and Residences | 281.93m | 58s | JFC Capital | Zeidler

    I was not even by the open gate,I was just taking a picture through a crack in the fence. They put this weird green tarp around the fences, like they really don't want people to see what they are doing. Anyway, next time I am going to take as many as I want, as long as I am not standing...
  8. P

    Toronto St Regis Toronto Hotel and Residences | 281.93m | 58s | JFC Capital | Zeidler

    This is the only one I could take, a construction worker advised me not to take pictures of his crew, pretty retarded, but I was not going to argue, it might make them even slower.
  9. P

    Bay Adelaide Centre West Tower (Brookfield, 50s, WZMH)

    Little Update Yay Steel More steel and what looks to be a third crane, second mobile one. Some Forms Signs that show that the sidewalk is probs going to be closed during the erection of the steel. Some of the hoarding was taken down, I assume this has to do with the...
  10. P

    The Tenor (10 Dundas St E, Ent Prop Trust, 10s, Baldwin & Franklin)

    So the put the signs that I saw them bring to the building last Sunday, what they did last sunday, they stored all the signs on the roof and the yesterday it seems they installed them, kinda strange but it looks pretty good so far. I don't have the time to go take pics today. Paul
  11. P

    The Tenor (10 Dundas St E, Ent Prop Trust, 10s, Baldwin & Franklin)

    This morning around 9 am I walked past metropolis on the way to work and all along victoria street there were backlit bill boards on the back of trailers. They also had two cranes on-site. I come back around 4pm and there nothing and no new signs. what the hell did they do? Anyon know?
  12. P

    Bay Adelaide Centre West Tower (Brookfield, 50s, WZMH)

    I am starting to think steel too, They are not using pre-fab forms for the floors, they are making them all custom. So I am guessing that that it will be steel from ground up.
  13. P

    Toronto St Regis Toronto Hotel and Residences | 281.93m | 58s | JFC Capital | Zeidler

    Still no hoarding s of yesteday, but they seem to be really busy :rolleyes:
  14. P

    Bay Adelaide Centre West Tower (Brookfield, 50s, WZMH)

    A few from yesterday And the floors are starting to come along, I still cant figure out whether this is going to be concrete or steel. Paul
  15. P

    The Tenor (10 Dundas St E, Ent Prop Trust, 10s, Baldwin & Franklin)

    If you look at the diagram at the bottom of page 138 of this thread you will see the latest brackets they were putting up last night and today are for that huge backlit, "H", should be impressive to see that one go up, its gunna take away alot of the grey look of the building. They might try...
  16. P

    The Tenor (10 Dundas St E, Ent Prop Trust, 10s, Baldwin & Franklin)

    Around seven this evening they had some construction workers up on one of the platforms preparing some brackets. East of the Trivision.Hopefully you get another sign soon. Paul
  17. P

    The Tenor (10 Dundas St E, Ent Prop Trust, 10s, Baldwin & Franklin)

    Its the brackets for the Tri-vision. I am going to see if I can get some pics before it gets dark. Otherwise tomorrow. How long you reckon until the tri-vision is up, 1-2-3 weeks? Paul
  18. P

    The Tenor (10 Dundas St E, Ent Prop Trust, 10s, Baldwin & Franklin)

    This latest update may seem to some as a tad underwhelming however it has to be remembered that this is V1 of all the Ad's, in 5 years that building could be covered in only Video Boards. If you use Times-square as an example, most of the time ad space start off as a simple billboard and at the...
  19. P

    Bay Adelaide Centre West Tower (Brookfield, 50s, WZMH)

    So they were pouring concrete today for the core, I over heard a construction worker say that they were going to have to jack the crane up either tomorrow or Saturday. Anyway heres the update: Not really relevant to Bay adelaide, but just the fog that there was dowtown today...