News   Sep 16, 2019
 1K     6 
News   Sep 16, 2019
 1.3K     16 
News   Sep 16, 2019
 1K     0 

Search results

  1. sikandar

    Toronto | CIBC SQUARE | 241m | 50s | Hines | WilkinsonEyre

    I fully expect the glazing and lighting to look as good, if not better than the renderings. My only wish at this point is that CIBC reveals a new logo before it's time to slap them on the top of this beauty.
  2. sikandar

    Scotiabank Arena (Air Canada Centre) Renovations

    September 9 - this has been much more involved than I thought it would be.. they’ve been chipping away at this thing for a couple of weeks now. Leafs home opener is on October 2.
  3. sikandar

    Toronto | 16 York | 155m | 32s | Cadillac Fairview | architectsAlliance

    Some would say "stand out" in a good way, others would say "stick out" in a bad way.. I think given the height they had to work with, the little shift this building has was pretty much the boldest thing they could do without disturbing the established design profile of this intersection. As for...
  4. sikandar

    Toronto | CIBC SQUARE | 241m | 50s | Hines | WilkinsonEyre

    Friday night special
  5. sikandar

    Scotiabank Arena (Air Canada Centre) Renovations

    I believe so - it’s no longer lit up at night. It’s also not in the renderings.
  6. sikandar

    Scotiabank Arena (Air Canada Centre) Renovations

    Putting together the next couple of letters. BTW you can see in the back where they test painted a small area of the louvers.
  7. sikandar

    Scotiabank Arena (Air Canada Centre) Renovations

    "The galleria improvements should be completed in the next 12 months, part of a larger plan that will take four to five years." Happy to hear! Hopefully the PATH connection/stairs on the west side of the arena are a part of this 4-5 year plan. With 30 Bay coming online within 4 years, a rebuild...
  8. sikandar

    York Street Park (Waterfront Toronto/City of Toronto)

    I can't believe I'm asking this, but what will be completed first, this or The Hub?
  9. sikandar

    Toronto | Union Station Revitalization | ?m | ?s | City of Toronto | NORR

    I avoid BlogTO articles now - their formula is basically to clickbait with the headline and then try to live up to the headline by amplifying the content. It's like everything that's wrong with social media in a news format.
  10. sikandar

    York Street Park (Waterfront Toronto/City of Toronto)

    Construction to be completed in 2023?! Wow.
  11. sikandar

    Toronto | 16 York | 155m | 32s | Cadillac Fairview | architectsAlliance

    The landscaping in this area is decent, but more interaction between the buildings and the sidewalks is desparately needed on the ICE-condos side. As well, "The Canopy" art display at 15 York has been down for years now, but provided a much-needed source of animation for this stretch. I'm not...
  12. sikandar

    Scotiabank Arena (Air Canada Centre) Renovations

    The massive Scotiabank branding next to the TV will remove the daylight entering the Gate 5 atrium/PATH and vista of Bremner Blvd, not to mention how ridiculous it will look to have several logos in the same view. When something brands the neighbourhood more than the building, that's when the...
  13. sikandar

    Scotiabank Arena (Air Canada Centre) Renovations

    July 22 - signage structure is up; beginning to remove glass to accommodate the larger TV.
Top