This is the 36th floor and so the next two floors will comprise the second mechanical section. Given the fair weather and that they have optimised their process, it should take less time than the last mechanical section.
It is not just the bracing but also the construction hoists. If it is done in a way similar to other buildings, some sections of the south side have to to be done after the tower tops out and crane and hoists are removed.