News   Aug 16, 2024
 1.1K     0 
News   Aug 16, 2024
 678     0 
News   Aug 16, 2024
 542     0 

Search results

  1. R

    Toronto Y&S Condos | 130.77m | 38s | Tribute | Graziani + Corazza

    Concrete pour of level 2 from November 23: Photos from today (Dec 11): Given my convenient view, I'll probably post updates every few weeks. They're going fast
  2. R

    Toronto Crosstown LRT: Eglinton Station | ?m | 1s | Metrolinx | Arcadis

    Lots of road construction happening in these next few weeks. As per the community notices, it seems like the road surfaces will be mostly finished by end of Jan. Permanent traffic lights were just installed a few days ago across all four directions. Here are some photos As well, the...
  3. R

    Toronto U of T: Faculty of Medicine Building Expansion | ?m | ?s | U of T | MVRDV

    I work with MRI scanners, and some NMR scanners. There is almost always a taped outline for the residual magnetic field of 5 Gauss (0.005 Tesla) around the scanner. Electronic devices generally operate no problem outside the 5 Gauss line, which is why we have it outlined. However since NMR...
  4. R

    Toronto U of T: Landscape of Landmark Quality | ?m | 1s | U of T | MVVA

    The Hulk of course! It's so funny watching it and being like "oh wait that's literally my school"
  5. R

    Toronto 160 Front West | 239.87m | 46s | Cadillac Fairview | AS + GG

    Today around 1:30pm, seen all the way from Sunnybrook Hospital
  6. R

    Toronto U of T: Schwartz Reisman Innovation Centre (Phase 1) | 64.8m | 13s | U of T | Weiss/Manfredi

    Sunset on November 16 from PMCRT: From peering in, it seems like a lot of the interior is furnished. I wonder when it will open doors
  7. R

    Toronto Crosstown LRT: Eglinton Station | ?m | 1s | Metrolinx | Arcadis

    Nice photo! Question for anyone: I haven't seen sand being used as a filler below road surfaces before. Is this common?
  8. R

    Toronto U of T: Landscape of Landmark Quality | ?m | 1s | U of T | MVVA

    November 11: small update, but mulch has been added to many of the needed areas sometime this last week: What's interesting is you can see some steam/hot water pipes sticking out of the ground at Med Sci. This is for the future Med Sci renovation, which will include a geothermal field...
  9. R

    Toronto Y&S Condos | 130.77m | 38s | Tribute | Graziani + Corazza

    November 3 photos from above: November 10 photos from above:
  10. R

    Toronto Crosstown LRT: Eglinton Station | ?m | 1s | Metrolinx | Arcadis

    November 10: it looks like they are encasing the surface utilities in concrete! No more digging, only backfilling now! One step closer to having the road repaved. Due to the concrete pumping truck, Eglinton is one lane at Yonge - Eglinton with police guiding traffic. Be on the look out for...
  11. R

    Toronto U of T: Landscape of Landmark Quality | ?m | 1s | U of T | MVVA

    You can easily get on the pedestrian only path by driving west on Wellesley and turning right onto Hart House Circle. I've seen many Ubers do that and it's quite frustrating to see. There's no road to walkway transition over there (i.e it's continuous). Obviously construction vehicles need to...
  12. R

    Toronto U of T: Landscape of Landmark Quality | ?m | 1s | U of T | MVVA

    Before this project, the lawn was in really rough shape. It has been in rough shape for probably its entire lifespan (150 years?). Hopefully given this is the "landmark" of UofT, proper lawn care will take place.
  13. R

    Toronto U of T: Landscape of Landmark Quality | ?m | 1s | U of T | MVVA

    Today (oct 16) they are demolishing the old steam tunnel which was blocking the vehicle entrance to the garage since the start of this project. As well, here is a top down photos from today
  14. R

    Toronto U of T: Landscape of Landmark Quality | ?m | 1s | U of T | MVVA

    October 2 2023: I just wanted to highlight one of the photos from Northern Light. If my understanding is correct, It seems they are finally going to tear down the very old steam pipe that is awkwardly situated in the path of the garage tunnel. Take a look at the current steam pipe placement...
  15. R

    Toronto Hurvitz Brain Sciences Centre at Sunnybrook Hospital | ?m | 2s | Sunnybrook Hospital | HDR

    September 25, 2023 looking south from inside sunnybrook hospital (hallway to Harlequin's cafe).
  16. R

    Toronto U of T: Lash Miller Building Expansion | 25.03m | 4s | U of T | Mikkelsen Arkitekter

    interesting, why would they be setting up tree barriers then? I've been at UofT for almost a decade now and throughout all their major building construction projects, fairly permanent tree barriers have been used (made from plywood, not the orange mesh stuff) - so I'm assuming these barriers are...
  17. R

    Toronto U of T: Lash Miller Building Expansion | 25.03m | 4s | U of T | Mikkelsen Arkitekter

    It seems major construction is starting at the proposed renovation site. There are "permanent" TPZ barriers up, along with a road closure (the through road between Sydney Smith and Lash miller was always closed to cars). Looking south at Lash Miller: Looking north west from St. George

Back
Top