News   Jul 26, 2024
 787     0 
News   Jul 26, 2024
 2K     2 
News   Jul 26, 2024
 1.7K     3 

Search results

  1. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    We are waiting for your progress picture. 🙂
  2. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    Haha. Great! There is a truck driver shortage, they are hiring.
  3. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    Toddler will be a great construction project manager.
  4. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    @evandyk @Kama @Undead - Those are ALUMA DEK. They are used for slab formwork. The Aluma Dek® is a modular, panelized decking system that simplifies assembly and shortens production time. https://www.aluma.com/us/products/formwork_shoring/slab_formwork/aluma_dek
  5. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    https://pembertongroup.com/construction_updates/construction-overview-for-july-12-july-16-2021/
  6. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    In the buildings depends on the design, mechanical engineers consider some of the floors for the mechanical runs and connections (Storm, sanitary, etc). So they raise the ceiling height for those transfer floors and then be covered by drop ceilings, like the 10th floor here!
  7. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    Nice! I'm pretty sure you'll get a 9' ceiling.
  8. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    do you have a unit there? if so what floor?

Back
Top