News   Jul 26, 2024
 753     0 
News   Jul 26, 2024
 1.9K     2 
News   Jul 26, 2024
 1.6K     2 

Search results

  1. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    The future of Downtown Toronto (feat. The Ontario Line) by @FutureModelTO
  2. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    A closer look at development activity along the southern end of Downtown Toronto, toward the Entertainment District and Central Waterfront: by @FutureModelTO
  3. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    North buildings are 29 storey. I believe they are pouring 18th floor now.
  4. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    L1 and L2 are retail spaces, and residential units begin on the third floor. The major amenities are located on the 11th floor (the level with parapet walls). They are currently working on the 16th (construction) or 17th (municipal/marketing) floors.
  5. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    There's only one more floor, the 17th.
  6. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    I'm not sure but I think they are doing re and re.
  7. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    I believe the window and metal panel systems are in good working order and will not cause any problems for the condo or its owners in the future. The contractor is working on the building elevations to fix oil canning, gaps between panels, and other details, as far as I can tell.
  8. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    Has anyone recently looked at the south elevations (facing The Esplanade)? I believe they're repairing all of the metal panels.
  9. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    The trades of formwork, crane/hoist, drywall, and tile are on strike.
  10. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    There is a one-level underground parking garage for residents and visitors. There are also residential parking spaces on levels 2 through 10.
  11. G

    Toronto Time and Space Condos | 101.8m | 29s | Pemberton | Wallman Architects

    Strike involving 15K construction workers could impact residential builds in the GTA: union

Back
Top